Renovation of a water / sewer project in Wasilla, Alaska. Completed plans call for the renovation of a water / sewer project.

The City of Wasilla reserves the right to reject any or all bids/proposals and waive any procedural informality. Deadline to submit written questions: May 15, 2024 Response to questions no later than: May 20, 2024 This RFP Must Be Directed to the Purchasing Officer PURCHASING OFFICER: April Dwyer PHONE 907-373-9047 EMAIL:adwyer@cityofwasilla.gov The intent of the "Project" is to design and build (Design-Build) a completely operational, onsite electrical production system at the Spruce wellhouse location. The required technology has been pre-selected as Capstone Microturbines (https://www.capstonepowersolutions.com/). Initial load calculations identified the need for 3 (three) C65 Microturbines as a primary source of power. These natural gas Microturbines will be grid connected utilizing an automatic transfer switch (ATS), where grid power provided by Matanuska Electric Association (MEA) becomes the backup power source. The Project will include the following tasks: Design, Procurement, Construction, Installation and Commissioning. 4.02 Tasks 1) Design - The Project will follow standard design practices primarily including the requirement of engineered design drawings. Design drawings and details will include but are not limited to the following components: a. Site Design- This design component is anticipated to be simple and is intended to provide the overall layout of improvements including demolition, grading, utilities (existing and proposed), foundation design, fencing and other elements as required.b. Electrical Design- This design component will be the bulk of the design work for the Project. Design will include electrical site improvements and system tie-in for the proposed microturbine system. Electrical design will include details regarding equipment demo and placement within the existing building (plan and profile), line drawings, load calculations, conductor and conduit sizing, and details regarding grid tie as necessary for utility coordination and acceptance. c. Component Design- All proposed components shall have documented manufacturer's shop drawings, specifications, and performance standards. Components shall be specified as part of electrical design and engineering.

Award

Water / Sewer

$1,045,089.00

Public - City

Renovation

7

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
126
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

July 19, 2024

img_map_placeholder

To Be Determined, Wasilla, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.