BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 28, 2025

Site work and paving for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Project Control No: 1801311, 1901890, 1901891, 2000955, 2000956, 2101193, 2201150, 2201163, 2201165, 2201172, 2400103 Federal/state No: 1801311, 1901890, 1901891, 2000955, 2000956, 2101193, 2201150, 2201163, 2201165, 2201172, 2400103 Location Intersection Improvement Allen County - on Us 30 at Kroemer Road, 0.78 Mile West Of Us 33 (Rp 126+0073) New Interchange Construction Allen County - on Us 30 at Flaugh Road, 1.55 Miles West of Us 33 (Rp 126+0032 to 126+0058) New Bridge Construction 030-02-10796 Prestressed Concrete Bulb-t Beam Allen County - on O'day Road Over Us 30, 1.0 Mile West of Us 30 (Rp 124+0094) Bridge Deck Overlay 030-02-04409 Continuous Reinforced Concrete Slab Allen County - on Us 30e Over Seegar Ditch, 2.66 Miles West of Us 33 (Rp 124+0085) Bridge Deck Overlay 030-02-04409 Continuous Reinforced Concrete Slab Allen County - on Us 30w Over Seegar Ditch, 2.66 Miles West of Us 33 (Rp 124+0085) New Bridge Construction 030-02-10722 Prestressed Concrete Bulb-t Beam Allen County - on Flaugh Road Over Us 30, 2.37 Miles West Of Us 930 (Rp 125+0093) Intersection Improvement Allen County - on Us 30 at Stahlhut Road, 3.62 Miles West Of Us 33 (Rp 123+0095) Intersection Improvement, Roundabout Allen County - on California Road at Flaugh Road, 0.53 Mile South of Us 30 Intersection Improvement, Roundabout Allen County - on Kroemer Road at California Road, 0.52 Mile South of Us 30 New Bridge Construction 02-00360 Precast Reinforced Concrete 3-sided Structure Allen County - on O'day Road Over Hitzeman Ditch, 0.1 Mile South of Us 30 Ada Sidewalk Ramp Construction Allen County - Along Us 30, 1.55 Miles West of Us 33 (Rp 125+0032 to 126+0058) Completion Date: May 01, 2028 DBE Goal: 11.00 Qualifications: B(A) C(B) D(B) All Bidders Must Be Prequalified and Have Proper Qualifications and Bidding Capacity. An Executed Bid Bond Shall Be Included With All Bids. Only Electronic Bid Bonds Submitted Through the Designated Electronic Medium, Either Surety2000 or Tinubu Surety Solution, Will Be Accepted With the Bid. A Fully Executed Performance Bond Shall Be Included With All Bids, Except on Contracts for Roadside Mowing, Vegetation Control, Demolition, Landscaping, Fencing, Seeding and Sodding, Bridge Painting, and Guardrail Installations of $100,000 or Less, When the Bidder May Elect Not to Furnish a Performance Bond. Electronically Does Not Support Submittal of the Performance Bond. The Performance Bond Must Be Submitted to the Construction Letting Email Inbox or Be Delivered on Paper by the Time Set for Receipt of Proposal Bids. Each Contractor That Submits a Proposal Bid in the Amount of $150,000 or More for Highway Improvements Described in This Notice is Required to Submit With That Bid a Written Plan for a Program to Test the Contractor's Employees for Drugs. The Plan Shall Be in Compliance With Indiana Code 4-13-18. The Plan Must Be Submitted to the Construction Letting Email Inbox or Deposited With the Indot Engineer by the Time Set for Receipt of Proposal Bids. INDOT - Call 135 - New Interchange, Bridge and Sidewalk Construction - US 30 Questions from interested parties concerning a contract shall be submitted at least five business days prior to the contract's scheduled letting date and time if an answer is desired prior to the letting

Award

Roads / Highways

$50,912,302.00

Public - State/Provincial

Paving, Site Work

989

12

8

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
122
Bidding Soon
1,222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

July 14, 2025

Project location map

US-30, Fort Wayne, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.