Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2024 at 8:00 PM

Updated June 8, 2024

Site work for a power facility in McNeal, Arizona. Completed plans call for site work for a power facility.

Cochise County, hereinafter referred to as the County, through a Community Development Block Grant (CDBG) from the State of Arizona Department of Housing (ADOH) will accept bids from qualified firms or individuals who are licensed, registered, and in good standing with the Arizona Registrar of Contractors. This is a federally funded project which requires that contractors also be registered and verified in Electronically. Questions Due Date: May 30th 2024, 2:00 PM MST Contact Information: Anne Coppola, ACoppola@cochise.az.gov

Post-Bid

Solar Power Generation

$215,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
6
Bidding Soon
165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

July 8, 2024

Project location map

5141 W Terra Way, McNeal, AZ


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed