BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Muskogee, Oklahoma. Completed plans call for the renovation of a laboratory facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Cadaver Lab HVAC Unit Replacement Site Address: 2400 W. Shawnee St Site Directions: Muskogee Campus at the Administration building, located at 2400 W. Shawnee St, Muskogee Ok. 74401. The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidder's responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment "B" Including But Not Limited To: 1) Contractor shall supply state license verification for Mechanical, Electrical and Plumbing trades. 2) Contractor may utilize the main drive for deliveries and unloading but must maintain clear drive space at all times 3) Contractor shall supply TAB report and air exchanges per hour report, as listed on M101. 4) Contractor shall ensure all manuals for new equipment are housed inside or near the equipment/cabinet in a sealed plastic bag 5) Contractor shall supply and install temporary air filters as needed to maintain manufacturer's warranty during construction and install the specified filters for standard operations, per manufacturer's recommendations at turn over. 6) NSU is a "Tobacco Free" campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 7) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections in conjunction with State and City licenses. Contractor shall provide NSU with documentation of compliance at completion of work. 8) Contractor to be responsible for all permits and fees associated with this scope of work. 9) Work may be halted and resumed at any given time according to NSU's needs. 10) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 11) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours' notice prior to any utility outages/shut-offs. 12) Contractor shall be responsible for coordinating any and all utility locations for the project. 13) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 14) Contractor is responsible for all field verifications of dimensions and conditions. 15) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in contractor provided trash receptacle. 16) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 17) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 18) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 19) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 48 hours prior to the bid closing date. 20) Contractor shall be responsible for demolition, removal, loading and haul off of all materials, scraps and debris. 21) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 1. Performance Bond - 100% of Contract 2. Statutory Bond - 100% of Contract 3. Guarantee/Warranty Bonds - 100% of Contract

Post-Bid

Laboratories

$400,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
76
Bidding Soon
1,063
All Active Projects
502
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 25, 2024

July 25, 2024

img_map_placeholder

2400 W Shawnee St, Muskogee, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.