BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2024 at 8:00 PM

Updated November 28, 2024

Site work and paving for a mixed-use development in Millbrae, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of July 02, 2024, This project has been awarded to RNR Paving, with the awarded amount of $189,001.75.** Rehabilitation of half width of Hawthorne Way; the scope of work includes mobilization, traffic control, demolition and removal of 4" of existing asphalt concrete (AC) pavement to aggregate base, grade and compact aggregate base, place 4" of AC pavement overlay, restore pavement striping and markings after work is completed, and minor replacement of sidewalk, curb, & gutter that is in disrepair and marked in the field by City. Online Q&A Yes Q&A Deadline 05/29/2024 3:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%

Award

Roads / Highways

$189,002.00

Public - City

Paving, Site Work

4

10

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
219
Bidding Soon
3,092
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 22, 2024

Project location map

Hawthorne Way, Millbrae, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.