Site work for a water / sewer project in Rosedale, Maryland. Completed plans call for site work for a water / sewer project.

Replacement of Gate Valves at Golden Ring Maintenance Facility, 8375 Pulaski Highway, Rosedale, Maryland 21237. This Contract provides for the replacement of Gate Valves, Main Water Pressure Valves, Backflow Preventers and Associated Plumbing at Golden Ring Maintenance Facility. The contractor shall undertake the following tasks, originating from the county's directive to turn offthe water supply to the building . Water Supply Shutdown Preparation: o Coordinate with county authorities to safely shut offthe water supply to the building. . Demolition: o Remove existing Pressure Reducing Valve (PRV), gate valves, backflow preventer, and associated piping. . Area Preparation: o Modify the area to accommodate new gate valves, PRV, and backflow preventer. . Piping Installation: o Install new copper piping and fittings as required, adhering to industry standards. Piping to be pressed fitted or sweated, sweating is preferred method. Gate Valve and Backflow Preventer Installation: Install two new gate valves and a new backflow preventer, ensuring proper functionality and alignment. Backflow preventer shall be for the main water supply to building. Ball Valve Installation: Install a new ball valve for enhanced control and isolation. Connection Integration: Connect new piping to the main waterline and tie to existing water piping within the building, incorporating necessary concrete work for stability. Pressure Testing: Conduct pressure tests on all new fittings and connections to verify integrity and safety. Heat Trace Installation: Install heat trace to the outdoor ball valve to prevent freezing and ensure operability in all weather conditions. Cleanup: Thoroughly clean the work area, disposing of debris and materials responsible. Work Schedule: Perform all work after hours or on weekends to minimize disruption to the building occupants and operations. This scope ofwork outlines the comprehensive tasks required for the replacement of gate valves, main water pressure components, backflow prevention systems, and associated piping, ensuring the efficient and safe operation ofthe water supply system.

Post-Bid

Water / Sewer

$300,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
135
Bidding Soon
2,645
All Active Projects
1,079
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

img_map_placeholder

8375 Pulaski Hwy, Rosedale, MD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.