Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, asbestos abatement and renovation of a mixed-use development in Hermosa Beach, California. Completed plans call for the renovation of a municipal facility; for asbestos abatement for a municipal facility; for site work for a municipal facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of June 26, 2024, this project has not yet been awarded. The Project is expected to be awarded on July 09, 2024 during City Council Meeting** The project generally includes, but is not limited to: New commercial kitchen per current Los Angeles County Department of Public Health requirements, including new appliances, fixtures, storage cabinets, counter tops, flooring, grease trap system, and lighting; New electric heating, ventilation, and air conditioning (HVAC) system; New audio-visual system including built-in speakers, overhead projector, and roll-down projection screen; Architectural upgrades including, but not limited to: Furred out walls to hide items such as electrical conduit and provide a new smooth wall surface throughout, New decorative accents on the ceiling, Acoustic ceiling panels for sound absorption, New commercial grade vinyl flooring, New interior and exterior light fixtures, Complete interior and exterior cleaning and painting, and Restored original signage on the exterior of the building; New plumbing system to accommodate the updated restrooms and commercial kitchen, including new floor drains for ease in maintenance, including connection to the existing sewer lateral; Site improvements including new concrete walkways and ramps to current accessibility standards, decorative enclosures around the refuse storage area and HVAC units, new accessible entrance to the Lawn Bowling Club, and refreshed landscaping and irrigation. Completely renovated restrooms to current accessibility standards, including new fixtures, partitions, vanities, mirrors, flooring, and lighting; New electrical system including wiring including new service connection necessary to serve the enhanced building components; Asbestos and lead abatement work throughout the building; and Necessary demolition work associated with the renovation. The license requirement is a valid State of California Contractors License Class B. The duration of the project is one-hundred and twenty (120) working days. Each proposal must be accompanied by a cash deposit, a certified or cashiers check, or a Bidders bond, made payable to the City of Hermosa Beach, in an amount not less than 10 percent of the total bid submitted. The successful Bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the Contract price, a payment bond in the amount of 100 percent of the Contract price all in the attached forms satisfactory to the City Attorney. The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive and responsible Bidder. Please submit any questions related to this bid on Electronically no later than 12:00 P.M. on Tuesday, May 14, 2024.
Bid Results
Municipal
$207,201.00
Public - City
Asbestos Abatement, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2024
July 29, 2024
861 Valley Dr, Hermosa Beach, CA
Related To This Project
Hermosa Beach, CA
Bid Date: Jun 04 2024
Hermosa Beach, CA
Bid Date: Jun 11 2024
Hermosa Beach, CA
Bid Date: Jul 11 2024
Hermosa Beach, CA
--
Hermosa Beach, CA
--
Hermosa Beach, CA
--
Hermosa Beach, CA
--
Hermosa Beach, CA
--
Hermosa Beach, CA
Bid Date: May 23 2024
Hermosa Beach, CA
Bid Date: Apr 23 2024
Hermosa Beach, CA
--
Hermosa Beach, CA
--
Hermosa Beach, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.