BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2024 at 8:00 PM

Updated June 13, 2024

Site work, paving and outdoor lighting for a transportation facility in Manning, South Carolina. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

This project is for grading, paving, and lighting upgrades, and is funded FAA. Holt Consulting is managing this project on behalf of Clarendon County. FAA AIG NUMBER: 3-45-0038-019-202 PN. SC0306-06 This project generally consists of taxiway pavement reconstruction and lighting rehabilitation for the Taxiway “A” system at the Santee Cooper Regional Airport. Upon an initial review, it has been noted that the existing taxiway width does not comply with current FAA standards for Taxiway Design Group (TDG) 1A/1B. The existing taxiway is approximately 30’ wide and has non-standard radii in the turns. Since this project will involve reconstruction, the taxiway width and horizontal geometry will be updated to comply with the latest FAA standards (25’ wide). Reducing the taxiway width and updating the horizontal geometry will impact the location of the taxiway edge lights, causing them to be out of tolerance. Therefore, the project will include replacing all of the old and outdated edge lights with new energy efficient LED’s. The project will consist of a Base Bid, which involves all Taxiway “A” and Taxiway “B” work. The Additive Bid will consist of partial reconstruction of Taxilane pavement serving T-Hangars south of the existing apron.

Post-Bid

Transportation Terminals

$280,000.00

Public - County

Outdoor Lighting, Paving, Site Work

102

13

7

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
69
Bidding Soon
1,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

Project location map

To Be Determined, Manning, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.