Demolition, site work, paving and new construction of a bridge / tunnel in Oberlin, Louisiana. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of July 9, 2024 this project was put on hold, no definite date for the rebid. The Allen Parish Police Jury is seeking a vendor to supply a modular steel bridge structure only for the replacement of the Park Road Bridge. The construction of abutments and installation of the bridge will be bid under separate contract. The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section; and those stated in the bidding documents shall not be waived by any entity. When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed. Description and Scope - The Allen Parish Police Jury will be receiving bids for a vendor to supply a modular steel bridge structure for replacement of the Park Road Bridge in Allen Parish. A. GENERAL REQUIREMENTS - Short span beam bridges Design-build -The bridge supplier shall, under the provisions contained herein, design, fabricate, and deliver to the job site, ready for installation one (1) modular steel bridge designed for HL-93 Live Loading, complete with guard rail system. The guiderail system should conform to roadway applications for TL-2 impact strength. Dimensions - The bridge superstructure shall be 38 feet long and 24 feet wide, with skewed ends at the north and south abutment walls, Reference Figure No. A - Schematic Bridge Deck Plan. The length of superstructure shall be from out-to-out and does not include wing-wall or back-wall dimensions which must be added for total bridge system layout. The width shall be the clear roadway between guard rails. Bolt-together - The modular bridge should incorporate a full bolt-together design that minimizes the need or requirement for field-welding on the bridge. Minimal field welding may be required for the anchoring system. Each bridge module should incorporate more than one main support beam to maximize safety and eliminate a "fracture critical" designation. Bridge Handling - Each bridge module should be designed and supplied with a minimum of four (4) or more integral lifting lugs to facilitate safe handling and placement of the bridge module. Bridge Installation - Each modular steel bridge should be delivered with a comprehensive installation plan that provides manufacturer's recommended handling, placement, fit-up and securing to the abutment system. The installation plan should be laminated and suitable for review in a field environment. Offloading of the bridge at the delivery site, general bridge installation, and approach work necessary for the bridge to accept traffic will be supplied by contractors approved by the owner under separate contract from the bridge.
Final Planning
Bridges / Tunnels
$200,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2024
January 9, 2025
602 Court St, Oberlin, LA
Related To This Project
Oberlin, LA
Bid Date: Sep 26 2024
Oberlin, LA
--
Oberlin, LA
Bid Date: Oct 07 2024
Oberlin, LA
Bid Date: Mar 21 2024
Oberlin, LA
Bid Date: Feb 09 2024
Oberlin, LA
Bid Date: Feb 09 2024
Oberlin, LA
Bid Date: Dec 05 2023
Oberlin, LA
Bid Date: Nov 29 2023
Oberlin, LA
Bid Date: Nov 16 2023
Oberlin, LA
Bid Date: Nov 08 2023
Oberlin, LA
Bid Date: Oct 30 2018
Oberlin, LA
Bid Date: Jan 11 2022
Oberlin, LA
Bid Date: Mar 22 2023
Oberlin, LA
Bid Date: Mar 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.