Site work for a power facility in Sault Sainte Marie, Michigan. Completed plans call for site work for a power facility.

UPDATED PRE NOTICE May 15, 2025 The U.S. Army Corps of Engineers, Detroit District is seeking contractors for the 15kV Switchgear Replacement project the Soo Locks in Sault Ste. Marie, Michigan. This project consists of removing the existing 15kV switchgear lineups (referred to as bus 1 and 2) on the 600.0 level of the New Power Plant (NPP) and replacing them with a single 15kV lineup in the location of existing bus 2. In the location of removed bus 1, a block wall is to be installed to partition the spreader room with the main floor of the power plant. In addition, the existing transit cable tray in the spreader room is to be replaced in kind with aluminum ladder tray. Seismic requirements will not be applicable for this project. The U.S. Army Corps of Engineers, Detroit District intends to issue a Request for Proposal (RFP) to award a single firm fixed-price ion contract for the replacement of the existing 15kV medium voltage switchgear in the Main Powerhouse. This current switchgear is original equipment and is causing increased reliability and operational risks due to obsolete parts and age. This project is for the replacement of the complete medium voltage switchgear system which includes cabling, all generator instrumentation transformers, benchboard modifications including new metering, control switches and internal wiring, revisions to existing protective relaying settings as required, surge arrestors, and interface wiring for alarm, communication, and control. This project also replaces asbestos cable tray with a new cable tray. This project will increase the reliability of the power distribution with the replacement of outdated obsolete equipment. General Information: This procurement will be evaluated utilizing FAR Part 15. The will be issued under Number W911XK25R0019. This pre- notice updates the notices previously posted on June 1, 2023 (which referenced prior pre- number W911XK23R0003; https://sam.gov/opp/896f23564a0641d8a2441eee67500288/view) and October 8, 2024 (which referenced prior pre- number W911XK24R0037; https://sam.gov/opp/4ae811bf9192477bba5217062cf53cee/view). This pre- notice also relates to the following Notices of Intent to Sole Source posted on March 24, 2023: 23NOIBrandNameVoith (https://sam.gov/opp/e8dde7b97ed1461884628b9bb8e12941/view) and 23NOIBrandNameABB (https://sam.gov/opp/daae1e966c904b349704a5f253e3bf9f/view). In accordance with FAR 36.204 the magnitude of ion is between 5 million and 10 million. The project will be solicited under Full and Open Competition. North American Industrial Classification System (NAICS) is 238210 Electrical Contractors and Other Wiring Installation Contractors. The Small Business Size Standard for this NAICS is 19 million in average annual receipts. Product Service Code (PSC) 6110 Electrical Control Equipment The is anticipated to be issued in May/June 2025. The package materials, documents, drawings, specifications, and attachments will be available only electronically and via sam.gov where there will be a link to the attachments which will be stored in the Procurement Integrated Enterprise Environment (PIEE) system. Electronic submission is required through the PIEE Module suite at https://piee.eb.mil/. All contractors must be registered on both SAM.gov and PIEE. The Government will NOT supply hard copy documents to any interested parties as a result of this . Please note: the Government will NOT maintain a bidders list during the period. Interested contractor must have an active registration in the System for Award Management (SAM) prior to submission of proposals to be eligible to conduct business with the Federal Government. Contractors can access SAM for free at www.sam.gov. No questions will be answered if received later than ten (10) business days prior to the due date for proposals. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The excitation system of a Hydro Generator is affected by the 15KV Switchgear Replacement Project. Updating the excitation system to work with the new switchgear requires engineering services, drawing support, and on-site commissioning. The Contractor shall furnish all management, labor, tools, and test equipment necessary to perform all updates, configure the new module, update drawings, update the Operations & Maintenance Manual, verify interlocks, and do performance reviews in order to detect, prevent and fix the most common problems that might cause the excitation systems to fail with the new switchgear. The work is anticipated to be 80 hours for engineering services, 72 hours for documentation support, 116 hours on-site, and 40 hours for travel. notice to proceed by October 17, 2025 Completion- April 11, 2028 Question Deadline 06/30/2025 Small Disadvantaged Business (SDB) goal of less than 5%

Award

Power Plant

$8,230,860.00

Public - Federal

Site Work

237

16

20

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
97
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

November 14, 2025

Project location map

Soo Locks, Sault Sainte Marie, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.