Site work for a water / sewer project in Sault Sainte Marie, Michigan. Completed plans call for site work for a water / sewer project.
**As of August 01, 2025, the project was awarded to Team Elmers, with an awarded amount of $12,018,463.24.** Approximately 2.9 miles of water main replacement and 137 lead or galvanized previously connected to lead service lines throughout the City of Sault Ste. Marie. The work also includes water main appurtenances, service line replacements, pavement removal and replacement, and associated restoration. A pre-bid conference will not be held for the project. The City reserves the right to reject any and all bids and to waive irregularities in bids and to accept any bids which in the opinion of the City Commission may be most advantageous to the City of Sault Ste. This work shall consist of all labor, materials and equipment required to maintain traffic within the construction influence area of the EGLE Project No. 7771-01 Contract #1: Water Main and Lead Service Line Replacements. work consists of providing a film (DVD) record of physical, structural and aesthetic conditions of the area described as: 1. Construction Zone from POB to POE to define the project length and from Rights of Way to Rights of Way to define the project width. The Audio-Visual Filming shall capture the area defined above as it exists prior to the beginning of any construction activity. Ensure the film is of professional quality and provides a clear and accurate visual record of existing conditions. Complete filming, under the supervision of the Engineer, before any construction activity is started. Furnish the completed DVD to the Engineer at least 7 calendar days prior to placement of any materials or equipment in the construction area. Re-film any portion of the DVD determined by the Engineer to be unacceptable for the documentation of existing conditions prior to the start of any construction activity at no cost to the Department. Work includes the removal and disposal of existing pavement and driveways as specified on the plans, in the Proposal, or as directed by the Engineer. Work shall be performed in accordance with section 204 of the Standard Specifications for Construction, except that additional payment will not be made for multiple layers of pavement or driveway regardless of thickness and type of pavement. This work shall consist of all labor, equipment, and materials necessary to complete exploratory excavation where the Contractor needs to locate and expose underground infrastructure and obstructions, such as culverts, sewers, and utilities as approved by the Engineer. Perform this work only when conflicts are found in the planned work location. This special provision is not to compensate for the Contractor's responsibilities in subsection 107.12 of the MDOT Standard Specifications for Construction. This work shall consist of all labor, equipment, and materials necessary to complete ditch grading. The work shall be completed at the locations and in accordance with typical cross sections, as shown on the plans, or as directed by the Engineer. This work shall consist of furnishing and installing sidewalk and sidewalk ramps at intersections in accordance with section 803 the Standard Specifications for Construction and Standard Detail R-28-J, except as modified herein. This work consists of providing all labor, equipment and materials necessary for removing, salvaging, and replacing fencing as shown on the plans or as directed by the Engineer. Conduct this work in accordance with section 204 and 808 of the Standard Specifications for Construction and the additional work detailed on the plans and this special provision. This work shall include replacement of existing lead or galvanized service lines in accordance with the plans, this special provision, and the MDOT 2020 Standard Plans and Specifications. For the protection of underground utilities and in conformance with Public Act 174 of 2013, the Contractor shall contract the Miss Dig system, Inc. by phone at 811 or 800-482-7171 or via the web at either elocate.missdig.org for single address or rte.missdig.org, a minimum of 3 business days prior to excavation, excluding weekends and holidays. The Contractor shall contact the Engineer to schedule work that may interfere with existing water service. Approval of temporary shut off shall be obtained from the City of Sault Ste. Marie. The project consists of water main replacement and rehabilitation throughout the city of Sault Ste. Marie. The work also includes water main appurtenances, 137 lead service line replacements, soil erosion and sedimentation control, flow maintenance, pipe bedding, pavement removal and replacement, and associated restoration. Replacement of approx. 1,600' of 6" diameter water main replacement on Riverside Dr from East 3 Mile Rd to north of East Sky Blue Dr via open cut. Work includes water main appurtenances and road replacement.
Award
Water / Sewer
$12,018,463.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2025
September 29, 2025
Multiple Locations, Sault Sainte Marie, MI
Related To This Project
Sault Sainte Marie, MI
Bid Date: Jun 09 2025
Sault Sainte Marie, MI
Bid Date: Aug 07 2025
Sault Sainte Marie, MI
Bid Date: Jun 27 2025
Sault Sainte Marie, MI
Bid Date: Jun 24 2025
Sault Sainte Marie, MI
Bid Date: Jun 20 2025
Sault Sainte Marie, MI
Bid Date: Aug 22 2025
Sault Sainte Marie, MI
Bid Date: Aug 25 2025
Sault Sainte Marie, MI
Bid Date: Jul 18 2025
Sault Sainte Marie, MI
Bid Date: May 14 2025
Sault Sainte Marie, MI
Bid Date: Jun 09 2025
Sault Sainte Marie, MI
Bid Date: Jun 09 2025
Sault Sainte Marie, MI
Bid Date: Jun 09 2025
Sault Sainte Marie, MI
Bid Date: May 15 2025
Sault Sainte Marie, MI
Bid Date: May 13 2025
Sault Sainte Marie, MI
Bid Date: Apr 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.