BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Danville, Virginia. Completed plans call for the renovation of a residential development.

Instructions: It is understood that our terms and conditions listed on back will apply to any order that may result from this solicitation. Note any exceptions for our consideration. F. O. B. Destination: It is the basic policy of the City to receive goods F. O. B.( free on board) Destination, which means that freight Quote Required By Send Quote To charges are paid by the seller who owns and assumes all risk for the goods until they are accepted at the designated delivery point. The cost of shipping the goods may be included in the quoted price or by the seller as a separate line item. Request for Quotes to install a new architectural shingle roof at 310 Holbrook Street ROOF, CHIMNEYS AND GUTTERS a. Tear off and discard metal " A" roof and front porch. DO NOT replace any EPDM that' s new. b. Install ALL new 7/ 16 O. S. B on " A" roof and the front porch. Plywood clips are not required if overlaying the plywood. c. Install painted metal roofing on the front porch with in-kind like material. d. Install snow guards on front porch roof. e. Install white aluminum drip edge on all roof edges. f. Install synthetic felt paper on the front porch roof only. Felt paper must be installed Horizontal not vertical. g. Install Ice and Water Shield at all eaves and rakes, in valleys, around chimneys for" A" roof and front porch. h. Install 15# roofing felt on the entire roof. Felt paper must be installed Horizontal not vertical. i. Install 30- year architectural fiberglass shingles, Class-A self-sealing roofing shingles on " A" roof. Include new flashing on all vents, chimneys, and valleys. j. Install 32 ft. of ridge vent ( Shingle over vent) on ridge of roof. Using a chalk line, strike a line on either side ofthe ridge board 7/ 8 of an inch down from the ridge board at the peak of the roof. If you have trusses, you should strike the chalk line such that it will create a gap 1- 3/ 4 inches across the peak when you get to the cutting step. k. Tear out and discard approx.: 300 LF gutter board/ soffitt/ fascia. 1. Install new gutter board/ soffit/ fascia 300 L.F. ( Match Existing) NOTE: Contractor shall verify roof and house size prior to bidding. Also: All roofs will be inspected for proper installation. Contractor is responsible for all permits. All work is to be done in a WORKMANLIKE manner. Work being done shall meet all existing State and Local Codes. All the exterior work on the house must match the original designed. SELECTIONS BY OWNER NOTE: All selections by owner shall be reviewed and approved, in advance, by the Community Development representative. The owner shall select the following items: Roof shingles color

Bid Results

Residential Subdivision

$17,540.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
49
Bidding Soon
1,144
All Active Projects
409
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

img_map_placeholder

310 Holbrook St, Danville, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.