BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Danville, Virginia. Completed plans call for site work for a water / sewer project.

Last Day for Questions:May 22, 2024 at 5:00 PM Email questions to Marc Adelman, Transportation Services Director, adelmmd@danvilleva.gov AND purchasing@danvilleva.gov All work shall be completed by June 30, 2024. A notice to proceed will be coordinated with the Citys project manager. The contractor will be charged liquidated damages in the amount of $300 per each calendar day, including weekends and holidays, the project remains incomplete beyond the indicated time of completion. SCOPE OF WORK It is the intent of this “RFP” to secure, through competitive negotiation, a highly qualified and responsible contractor with extensive plumbing services experience to perform the Scope of Work described herein. The Scope of Work as described below may not be all-inclusive and is meant to provide a general description of the requirements and objectives of the City for each project. Offerors are encouraged to submit any questions they may have as to the scope of work or any other aspect of this project in writing as indicated on the RFP cover page prior to proposal submission. The Contractor shall provide all labor, equipment, tools, incidentals, and materials (except as noted) to complete each project. Federal and state funding has been awarded to the City of Danville to assist with financing the project as identified below. Contractor will verify the location and depth of the existing 4” oil/water separator piping located in the garage shop area (drawing identified on the following page). Piping is to be exposed and extended to the new sand pit that will be installed by the contractor. The pipe extension shall be the same size as the existing building piping. A trench drain is to be installed in the wash area along the entire existing maintenance pit area, which is 90’ feet in length to accommodate vehicles being washed. The trench drain is to be connected to a sand separator box. (Trench drain and sand separator shall be installed in accordance with 2021 Virginia Plumbing Code). Cleanouts shall be provided to service the drain system and sand separator. Contractor shall verify existing water supply is sufficient for usage of equipment provided for the wash process. Two (2) wall spigots are to be plumbed and installed on the east wall of the transit garage and located 37’ and 52’ from the north corner of the building. Cross Connection Control shall be provided for all hose and equipment connections to protect the potable water service provided to the washing area. Please note this project includes federal contract clause requirements including Davis Bacon wage requirements. Davis Bacon wages are attached. Interested companies must execute the sign off sheet related to these requirements. Interested contractors are encouraged to seek DBE participation for this project. The national goal for participation of Disadvantaged Business Enterprises (DBE) is 10%. The Danville Transit System’s overall goal for DBE participation is 5.3%. A separate contract goal has not been established for this procurement. City of Danville, Transportation Services Department, Marc Adelman, Transportation Services Director, adelmmd@danvilleva.gov, 434-799-5110

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
45
Bidding Soon
1,218
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

June 10, 2024

img_map_placeholder

1002 South Boston Rd, Danville, VA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.