BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 7, 2025

Site work and paving for a mixed-use development in Greenwood Village, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000383592 Job Location: Holly Street and Berry Avenue The project consists of providing all material, equipment, and labor for reconstructing the asphalt surface of the 8' wide Berry Trail, installing additional drainage improvements, conducting earthwork and restoring existing pavement, landscape and irrigation. Question Deadline 04/30/2025 at 2:00 PM MT Questions are submitted online Yes, Any questions regarding the project should be submitted electronically via the online. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The City requires a certified or cashier's check, or a corporate surety bond in the amount of five percent (5%) of the total bid amount before the City can accept or consider any bid for any bids greater than Fifty Thousand Dollars ($50,000.00). The bid and the deposit shall be filed with the Public Works Department, securely sealed, and endorsed on the outside with a brief statement as to the nature of the item or work for which the bid is provided. Upon a bid award, such bond shall be returned to the unsuccessful bidder(s). In the case of the successful bidder, the bid bond will be returned upon receipt of the required payment and performance bonds, each in the full amount of the contract price. No bid may be withdrawn for a period of sixty (60) days after the date set for opening thereof. The City reserves the right to reject any and all proposals, and to make final determination in the event of duplications The Notice to Proceed will be issued on a date between May 2, 2025 and May 23, 2025 mutually agreed to by the Contractor and the City. Contractor shall commence the Project within ten (10) days of date of the Notice to Proceed.

Bid Results

Sidewalks / Parking Lot

$229,547.00

Public - City

Paving, Site Work

1

6

11

5

Subscribe For Documents

155 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
97
Bidding Soon
1,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

May 23, 2025

Project location map

E Berry Ave & S Holly St, Greenwood Village, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.