Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 6, 2025 at 8:00 PM
Updated May 7, 2025
Site work and paving for a mixed-use development in Greenwood Village, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reference Number 0000383592 Job Location: Holly Street and Berry Avenue The project consists of providing all material, equipment, and labor for reconstructing the asphalt surface of the 8' wide Berry Trail, installing additional drainage improvements, conducting earthwork and restoring existing pavement, landscape and irrigation. Question Deadline 04/30/2025 at 2:00 PM MT Questions are submitted online Yes, Any questions regarding the project should be submitted electronically via the online. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The City requires a certified or cashier's check, or a corporate surety bond in the amount of five percent (5%) of the total bid amount before the City can accept or consider any bid for any bids greater than Fifty Thousand Dollars ($50,000.00). The bid and the deposit shall be filed with the Public Works Department, securely sealed, and endorsed on the outside with a brief statement as to the nature of the item or work for which the bid is provided. Upon a bid award, such bond shall be returned to the unsuccessful bidder(s). In the case of the successful bidder, the bid bond will be returned upon receipt of the required payment and performance bonds, each in the full amount of the contract price. No bid may be withdrawn for a period of sixty (60) days after the date set for opening thereof. The City reserves the right to reject any and all proposals, and to make final determination in the event of duplications The Notice to Proceed will be issued on a date between May 2, 2025 and May 23, 2025 mutually agreed to by the Contractor and the City. Contractor shall commence the Project within ten (10) days of date of the Notice to Proceed.
Bid Results
Sidewalks / Parking Lot
$229,547.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2025
May 23, 2025
E Berry Ave & S Holly St, Greenwood Village, CO
Related To This Project
Greenwood Village, CO
Bid Date: Jun 07 2024
Greenwood Village, CO
Bid Date: May 29 2024
Greenwood Village, CO
Bid Date: Jul 09 2024
Greenwood Village, CO
Bid Date: Aug 09 2024
Greenwood Village, CO
--
Greenwood Village, CO
Bid Date: Sep 06 2024
Greenwood Village, CO
Bid Date: Aug 30 2024
Greenwood Village, CO
Bid Date: Aug 30 2024
Greenwood Village, CO
--
Greenwood Village, CO
Bid Date: May 17 2024
Greenwood Village, CO
Bid Date: May 16 2024
Greenwood Village, CO
Bid Date: May 16 2024
Greenwood Village, CO
Bid Date: Dec 06 2024
Greenwood Village, CO
Bid Date: Apr 19 2024
Greenwood Village, CO
Bid Date: Apr 05 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
