BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated May 6, 2025

Site work and paving for a road / highway in Marietta, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Furnishing of all services, labor, materials and equipment required for the paving of Barlow Township Road 39 (Bell Rd) according to the specifications herein. Location- The work proposed under this contract is located on Barlow Township T-39, Bell Road. The roads that are preliminarily proposed to be paved are shown herein. However, some roads in part or in total may be deleted or others added depending on bid prices, availability of funds or road conditions may dictate. Also the amount of material required and the overlay thickness on each road or portions of roads may vary depending on the condition of the road at the time of paving. The estimated cost of the project is $211,858 and the project cannot be awarded if the bid price exceeds the estimate by 10%. TIME - No project activity shall begin before August 15, 2024. ; Completion Date: The entire project shall be completed by NOVEMBER 1, 2024. Question Deadline 05/16/2024 at 10:00 AM ET ASPHALT PAVER - Contractor shall coordinate with Barlow Township to allow for proper road closure notification and coordination, the road shall be closed to through traffic and asphalt placed in a single lift, full width of road. Paving machine shall be capable of placing a crown of Winch per foot on all roadways, with crown centered within 6 inches of actual center of existing roadway. The road shall be paved full width. ASPHALT CONCRETE INTERMEDIATE COURSE- The intermediate course shall act as the scratch coat and final surface course, applied in a single lift. Contractor shall attempt to level and fil in void / pothole areas prior to placing final intermediate course. Quantity utilized during scratch leveling shall be reduced from project total, with the final course applied with variable thickness but calculated as shown in the accompanying table. ASPHALT CONCRETE SURFACE COURSE - The existing road centerline and grade shall remain the same. The roads shall be resurfaced with an average thickness as shown in the estimated quantities, with the intermediate asphalt placed as final surface course in a single lift. DRIVEWAYS. MAILBOXES. INTERSECTIONS

Award

Roads / Highways

$189,190.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
1
Bidding Soon
597
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

August 15, 2024

Project location map

To Be Determined, Marietta, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.