BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 19, 2024 at 8:00 PM

Updated June 20, 2024

This is a service / maintenance or supply contract in Homosassa Springs, Florida. Contact the soliciting agency for additional information.

Counties: Citrus, Turnpike Road Name: Landscape at Suncoast Pkwy and Cardinal St. Mp 58 to 68.1 Limits: Midpoint Project(s): 19077855236(*) Federal Aid No: N/A Project(s): 19077855237 Federal Aid No: N/A Project(s): 19077855242 Federal Aid No: N/A Project(s): 19077855244 Federal Aid No: N/A Project(s): 19077855245 Federal Aid No: N/A Contract Days: 1445 Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Special Start Date: N/A Aquis/Flexible Start Time: 14 Description: The work specified in this Contract consists of providing all labor, materials, equipment, and all incidentals necessary to furnish, install, and establish landscaping at the following location: SR 589 Suncoast Parkway and the roadside slopes, from Milepost (MP) 58.0 to 61.5 and MP 67.0 to 68.1. The work shall include landscape installation, site preparation, mulching, mowing and litter removal, irrigation, and a two (2) year Landscape Establishment Period. No Pre-bid Conference Will Be Held for This Contract. Contractor Experience Documentation: Expertise and Experience is required in the performance of Landscaping. The Experience in Landscaping Form (850-070-09) must be filled out and submitted to be reviewed by the Department. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 Landscaping - SR 589 Question Deadline 06/04/2024 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online.

Post-Bid

Roads / Highways

$5,428,770.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
148
Bidding Soon
1,987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

June 21, 2024

Project location map

W Cardinal St & S Suncoast Blvd, Homosassa Springs, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.