BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated October 31, 2024

Site work and paving for a mixed-use development in Mexico Beach, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Bay Road Name: SR 30 (US 98) Limits: From W of Canal Pkwy to Gulf Co Line Project(s): 42695025201(*) Federal Aid No: D323036B Project(s): 42695025203 Federal Aid No: N/A Total Roadway Length: 3.649 Miles Contract Days: 260 Total Bridge Length: 0.034 Miles Total Proposal Length: 3.683 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 days. Description: The Improvements under this Contract consist of milling and resurfacing (RRR) the existing travel lanes, auxiliary lanes, and paved shoulders on SR 30 (US 98) from west of Canal Parkway to Gulf County Line in Bay County. The project also includes highway signing, pavement markings, sidewalk replacement, and other incidental construction under FPID 426950-2-52-01. Pedestrian crosswalks will be modified, relocated, or added. Bahama rock will be used to overlay portions of the shoulder. Under FPID 426950-2-52-03, an eastbound left turn lane will be added at 15th Street and associated drainage improvements will outfall along an easement on 16th Street. Bridges 460121 and 460025 are located within the project limits. Question Deadline 06/05/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 005: Resurfacing / Drainage Improvements / Base Work - SR 30 (US 98)

Award

Roads / Highways

$3,111,541.00

Public - State/Provincial

Paving, Site Work

80

5

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
34
Bidding Soon
489
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

June 22, 2024

Project location map

Canal Pkwy, Mexico Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.