BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Site work for a water / sewer project in Mexico Beach, Florida. Working plans call for site work for a water / sewer project.

As of August 15, 2025,The City Council has still not awarded bidder yet. No definite date for the rebid. This request for quotes is to perform construction of three concrete pads and permanently install and connect three bypass pumps to City lift stations #9, #11, and #13. Attached to this request for quotes, are plans prepared by Dewberry, dated May 2022 for the lift station installation details. Also attached to this request are plans developed for an elevated pad that was originally designed for a 300 KW generator with a wet weight of 5,400 lbs. The elevated pad design is proposed for construction as an elevated platform to support the bypass pumps at LS #9 and #11 (the bypass pump wet weight is 3,680 lbs) and therefore, it is assumed that the engineered design for the elevated pad is sufficient for the bypass pumps. The bypass pump installation requires that the bypass pumps be permanently installed and connected at each lift station and elevated to the 500-year flood elevation. . For LS #9, this requires that the bypass pump be elevated to 14.0 ft (NAVD 88) which would be approximately 7 feet above the existing grade. . For LS #11 the bypass pump must be elevated to elevation 14.0 ft which would be approximately 3 ft above the existing grade. . For LS #13 the bypass pump must be elevated to elevation 14.0 ft which would be approximately 1 ft above existing grade, therefore, the pad should be constructed according to the 12" concrete pad shown in the Dewberry plans dated May 2022. This scope of work also includes connection of the bypass pumps to the lift stations including all pipes and fittings as shown in the Dewberry plans and labor for all three lift stations. Please note this Request for Quotes does not include purchase of the bypass pumps. These have already been purchased by the City of Mexico Beach and are onsite/ready for installation. Question Deadline 12/05/2024 at 2:00 PM CT Questions concerning this request should be submitted in writing to, Chris Truitt, at c.truitt@mexicobeachfl.gov All questions pertaining to the terms and conditions of the scope of work of this RFQ must be submitted in writing via email to the City Clerk as shown below: TAMMY BRUNSON, City Clerk City of Mexico Beach t.brunson@mexicobeachfl.gov.

Final Planning

Water / Sewer

$579,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
29
Bidding Soon
488
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

November 25, 2025

Project location map

Multiple Locations, Mexico Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.