BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Sanibel, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

A. The contract work provides for the Periwinkle Way & Palm Ridge Road Shared Use Path Project and other related items pertinent and incidental thereto including the furnishing of all labor, materials, supplies, equipment, work and services, ready for satisfactory and continuous operation, in accordance with the drawings and specifications. B. The work included in this contract is described briefly as follows: The work consists of construction of a new asphalt shared use path along Palm Ridge Road and Periwinkle Way with associated stormwater management and ground cover. C. There is no pre-bid conference for this project. D. Construction is scheduled to begin AUGUST 2024 Question Deadline 06/03/2024 at 5:00 PM ET all questions must be submitted in writing to scott.krawczuk@mysanibel.com and received by stated time. The work consists of construction of a new asphalt shared use path along Palm Ridge Road and Periwinkle Way with associated storm water management and ground cover. Project Estimated Budget - 400,000.00 Proposals shall be properly and completely executed on a standard proposal form. Each proposal shall be accompanied by an acceptable certified check or cashier's check made payable to the City of Sanibel, or an acceptable Bidders Bond, in an amount not less than five percent (5%) of the total bid price. The Contractor to whom the work is awarded will be required to furnish an acceptable Surety Bond in an amount of one hundred percent (l00%) of the contract price. No bidder may withdraw his proposal within a period of sixty (60) days following the date set for receiving proposals. The City of Sanibel re!serves the right to hold any and all bids for a period of not more than sixty (60) days and said bids shall be and remain valid and in full force and effect during said period. The City of Sanibel reserves the right to reject any and all proposals and to waive informalities. No Pre-Bid Conference. For questions please contact Scott Krawczuk at scott.krawczuk@mysanibel.com

Bid Results

Water / Sewer

$400,000.00

Public - City

Paving, Site Work

9

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
21
Bidding Soon
382
All Active Projects
151
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

August 1, 2024

img_map_placeholder

Palm Ridge Rd & Periwinkle Way, Sanibel, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.