BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Anaheim, California. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bid is Cancelled. City of Anaheim is seeking a licensed contractor to provide slurry seal services for the parking lot at Stadium Gateway. Area: Clean and prepare approximately 152,000 square feet of asphalt; Apply one coat of parking lot slurry seal; Restripe to existing layout with two coats of paint; Cover and clean "Bott dots", replace broken ones as required during parking lot slurry and stripe; Repaint approximately 425 linear feet of top and face of red curbs; Reapply stenciling; Complete all work in two moves over a period of two weekends. Have valid California C32 - Parking and Highway Improvement contractor's license. Questions are due online in the Q&A tab no later than 2:00PM on May 21,2024 Summary 1. Provide all materials, tools, equipment and everything else necessary to perform the work per as specified herein. 2. Include minor items, which are obliviously and reasonably necessary to complete repair work, and usually included in similar work even though not specifically mentioned in these specifications. 3. Note that no additional compensation will be allowed due to misunderstanding as to the amount of work involved or lack of knowledge of any existing conditions that could have been discovered or reasonably anticipated prior to submitting bid. B. Preparation 1. Coordinate pedestrian and vehicular traffic at all times during operations. 2. Provide all necessary barricades, warning tape, and signage as required to protect walking and vehicular traffic from work area and work area equipment. 3. Do not damage anything that is intended to remain. 4. Protect all existing adjacent facilities. C. Cleaning 1. Maintain areas free of waste materials, debris, and rubbish. 2. Maintain site in a clean and orderly condition. 3. Clean all work areas prior to final completion before final inspection. D. Closeout Procedures 1. Notify CR, in writing, that work has been inspected, is in compliance with Specifications, and ready for CR's review. 2. Accompany CR on inspections to review work and establish punch-list items. 3. Correct punch-list items and notify CR of corrections for subsequent inspections within the agreed-upon times, generally within 5 calendar days. 4. Note that CR alone will determine project completion status. A. Site Information 1. Area: A) Stadium Gateway Office Complex B) 1900 S. State College Blvd., Anaheim, CA 92806 B. Specific Work 1. Work Schedule A) Coordinate closely with CR regarding schedules and work activities, which are subject to change based on special events, business activities, black-out dates, and the like. B) Provide at least a one week notification to CR prior to beginning any work; proceed only with CR's prior approval. 2. Field Operations A) Provide barricades and delineate all areas from the time work begins until the work is completed and the area is open for use. B) Do NOT utilize a fire hydrant for irrigation or a water wash down source without prior written authorization from CR. C) Ensure that all contractor employees are courteous, professional, minimize disturbances, are well-groomed, wear a company uniform while performing the on-site work. Replace, immediately, any employee, as determined by CR, who does not meet the foregoing requirement. D) Ensure that all utilized equipment is well-maintained operationally, inside, outside; tidy; licensed and registered as applicable. 3. Preparation A) Ensure that all required tools, equipment, labor, asphaltic materials, slurry seal, etc. are present before beginning any work. B) Ensure that the site is prepared properly prior to start of work. C) Follow all applicable manufacturer's instructions and applicable portions of the current Standard Specifications for Public Works Construction for preparation and installation.

Final Planning

Sidewalks / Parking Lot

$100,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
109
Bidding Soon
2,313
All Active Projects
1,032
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

January 2, 2025

img_map_placeholder

1900 S State College Blvd, Anaheim, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.