Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 7, 2024 at 8:00 PM
Updated June 8, 2024
Site work for a bridge / tunnel in Allen, Texas. Completed plans call for site work for a bridge / tunnel.
Bridge Repair Phase 2 The work to be performed under this contract consists of furnishing all necessary materials, machinery, equipment, superintendence, transportation, tools, supplies, plant, labor and appurtenances necessary for the complete construction of all improvements shown on the plans which are made part of the specifications for the City of Allen. Question Cuttoff Date & Time 5/28/2024 05:00:00 PM (CT) For questions, please contact the Purchasing Department at 214-509-4630 or Joshua.Young@cityofallen.org. DESCRIPTION Add the following paragraph: Where Type I cement is used, if required by the Owner, samples of the proposed Portland Cement will be obtained prior to beginning the work and one (1) set of three (3) cube specimens shall be made and tested at 3 days and 7 days for compressive strength. The 3-day strength shall have a minimum comprehensive strength of 1800 psi and the 7-day strength shall have a minimum comprehensive strength of 2800 psi. In addition, compressive strength cube specimens shall be made and tested at a frequency of one (1) set per 600 tons of cement used during construction so that the quality of the cement can be observed throughout the project. At the beginning of the project, samples of the cement shall be furnished to the laboratory to test for the fineness of the cement. Type I cement shall not exceed 1500 square centimeters per gram as measured by the Turbidimeter in accordance with Method C115. Also, at the beginning of the project, the time of setting by VICAT NEEDLES, Method C191, shall be made. The initial set shall not be less than 48 minutes.
Bid Results
Bridges / Tunnels
$2,157,430.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2024
July 8, 2024
Multiple Locations, Allen, TX
Related To This Project
Allen, TX
Bid Date: Jun 06 2024
Allen, TX
--
Allen, TX
--
Allen, TX
Bid Date: Dec 09 2020
Allen, TX
Bid Date: Nov 14 2024
Allen, TX
--
Allen, TX
--
Allen, TX
--
Allen, TX
--
Allen, TX
--
Allen, TX
Bid Date: May 21 2024
Allen, TX
Bid Date: May 09 2024
Allen, TX
Bid Date: Apr 18 2024
Allen, TX
Bid Date: May 09 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed