BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Shawnee, Oklahoma. Completed plans call for site work for a water / sewer project.

Replacement of approximately: 1,350 feet of 6-inch waterline along Alice Street from N Center Ave to N Pesotum Ave; 1,350 feet of 2-inch waterline along Fay Street from N Center Ave to N Pesotum Ave; 1,700 feet of 12-inch waterline along Edwards Street from N Center Ave to N Pesotum Ave; 2,200 feet of 6-inch waterline along N Pesotum Ave. from E Highland Street connecting to E Remington Street HDPE pipe and related appurtenances in the same corridors. Please direct all questions related to the design of this Project to the Q&A Section. Owner Rights: It is the intent of the Owner to award this Contract to the lowest responsible Offeror. The Owner reserves the right to adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating bid prices, to reject any or all Bids, and/or waive formalities. Bids will remain subject to acceptance and may not be withdrawn within 30 days from the date on which Bids are opened. Bond Notes : A statutory defect bond, performance bond, and payment bond will be required for this Project. Bid Security may be in the form of a bid bond, irrevocable letter of credit, cashier's check, or certified check. Checks must be made out to the City of Shawnee. The bid bond may be submitted on the form provided in Section 00 43 13 "Bid Bond" or Offerors may provide their surety's standard penal sum bid bond form. The bid bond must reference the Owner and Project by name as identified in this Section. Question Deadline 05/31/2024 at 5:00 PM CT Questions are to be submitted using the question and answer process on the procurement website. Responses to questions posted on the procurement website will be posted for the benefit of all Offerors. A response will be posted for questions submitted . Offeror will complete the Work required to be substantially completed within 120 calendar days after the date when the Contract Times commence to run as provided in the General Conditions. Offeror will complete the Work required for final payment in accordance with Article 15 of the General Conditions within 120 days after the date when the Contract Times commence to run. Estimate: $3,000,000.00 - $3,400,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$2,416,024.00

Public - City

Site Work

31

22

7

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
48
Bidding Soon
703
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

August 5, 2024

img_map_placeholder

Multiple Locations, Shawnee, OK


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.