BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2024 at 8:00 PM

Updated May 29, 2024

Site work and paving for a mixed-use development in Barling, Arkansas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This project includes the clearing and grubbing and general site maintenance of approximately 83 tracer wire junction boxes, 16 air release valve stations, 15 water valve boxes, 14 blow-off valve stations, and six (6) fire hydrants for a total of 134 sites. Site Directions: This water line runs parallel to Arkansas State Highway 22 from Barling, Arkansas to Bloomer, Arkansas.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Paving, Site Work

36

27

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
74
Bidding Soon
775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 27, 2024

Project location map

State Hwy 22, Barling, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.