Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2024 at 8:00 PM

Updated May 29, 2024

Site work and paving for a mixed-use development in Barling, Arkansas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This project includes the clearing and grubbing and general site maintenance of approximately 83 tracer wire junction boxes, 16 air release valve stations, 15 water valve boxes, 14 blow-off valve stations, and six (6) fire hydrants for a total of 134 sites. Site Directions: This water line runs parallel to Arkansas State Highway 22 from Barling, Arkansas to Bloomer, Arkansas.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Paving, Site Work

36

27

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
55
Bidding Soon
723
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 27, 2024

Project location map

State Hwy 22, Barling, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed