Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Lake Elsinore, California. Conceptual plans call for site work for a water / sewer project.
The purpose of the Proposal is to demonstrate the qualifications, competence, and capacity of Respondent to perform the work or provide the services described in this RFP. The Proposal should demonstrate the qualifications of the Respondent and of the particular staff to be assigned to this Project. This Project will be funded, in whole or in part, by a loan from the California State Water Resources Control Board ("CSWRCB") under the Clean Water Small Community Planning program ("Loan"). This Project may also be funded, in whole or in part, by funds from the Bureau of Reclamation ("BOR"). The successful Respondent will be required to comply with all applicable requirements of the BOR and Loan, including, without limitation, all applicable provisions of the Loan Agreement No D2201034, attached hereto as Exhibit "D" and incorporated by this reference. Project Description The Groundwater Management Plan (GWMP), prepared by EVMWD in 2005, identified the impact that nitrate from septic systems may be having on several drinking water supply wells as an important water quality issue. The Groundwater Quality Sampling and Modeling Project was designed to assist in quantifying the magnitude of the septic system influence on the groundwater basin. This information would provide greater perspective for EVMWD decision-making regarding the septic system regulations and how they relate to groundwater management and production. The modeling results and water quality sampling validated that septic systems impact the groundwater basin and contaminate migrating toward drinking water production wells. In general, water quality in all wells improves with depth, indicating the influence of land use and most importantly septic system discharges, may have a future impact on our groundwater quality. Based on the modeling results, the removal of the septic systems over a 20 to 40-year period, will produce significantly lower nitrate concentrations than if the septic systems remain in their current use. Furthermore, the analysis showed that early conversion of septic systems in the highest density areas will produce the highest benefit. The 2016 Sewer System Master Plan recommended EVMWD implement a phased septic system removal program. As part of the phasing, it is recommended that all septic systems in Sedco Hills and the Avenues areas be converted by the year 2035. Question Deadline: 06/18/2024 at 10:00 AM PT, Online Q&A: Yes Response Types Cost File Response File Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Anticipated Final Selection July 25, 2024 Project Start July 29, 2024 Preferences DBE - Disadvantaged Business Enterprise EVMWD intends to award the construction contract in September 2024, anticipating completion no later than July 2026. EVMWD intends to award the construction management and observation services contract in July 2024, anticipating completion no later than December 2026.
Conceptual
Water / Sewer
$250,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2024
Multiple Locations, Lake Elsinore, CA
Related To This Project
Lake Elsinore, CA
Bid Date: May 30 2024
Lake Elsinore, CA
Bid Date: Jun 20 2024
Lake Elsinore, CA
Bid Date: Jul 16 2024
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Jul 01 2024
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Oct 22 2024
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Jun 03 2024
Lake Elsinore, CA
Bid Date: Nov 14 2024
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: May 22 2024
Lake Elsinore, CA
Bid Date: May 15 2024
Lake Elsinore, CA
Bid Date: Jun 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.