BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Lake Elsinore, California. Conceptual plans call for site work for a water / sewer project.

The purpose of the Proposal is to demonstrate the qualifications, competence, and capacity of Respondent to perform the work or provide the services described in this RFP. The Proposal should demonstrate the qualifications of the Respondent and of the particular staff to be assigned to this Project. This Project will be funded, in whole or in part, by a loan from the California State Water Resources Control Board ("CSWRCB") under the Clean Water Small Community Planning program ("Loan"). This Project may also be funded, in whole or in part, by funds from the Bureau of Reclamation ("BOR"). The successful Respondent will be required to comply with all applicable requirements of the BOR and Loan, including, without limitation, all applicable provisions of the Loan Agreement No D2201034, attached hereto as Exhibit "D" and incorporated by this reference. Project Description The Groundwater Management Plan (GWMP), prepared by EVMWD in 2005, identified the impact that nitrate from septic systems may be having on several drinking water supply wells as an important water quality issue. The Groundwater Quality Sampling and Modeling Project was designed to assist in quantifying the magnitude of the septic system influence on the groundwater basin. This information would provide greater perspective for EVMWD decision-making regarding the septic system regulations and how they relate to groundwater management and production. The modeling results and water quality sampling validated that septic systems impact the groundwater basin and contaminate migrating toward drinking water production wells. In general, water quality in all wells improves with depth, indicating the influence of land use and most importantly septic system discharges, may have a future impact on our groundwater quality. Based on the modeling results, the removal of the septic systems over a 20 to 40-year period, will produce significantly lower nitrate concentrations than if the septic systems remain in their current use. Furthermore, the analysis showed that early conversion of septic systems in the highest density areas will produce the highest benefit. The 2016 Sewer System Master Plan recommended EVMWD implement a phased septic system removal program. As part of the phasing, it is recommended that all septic systems in Sedco Hills and the Avenues areas be converted by the year 2035. Question Deadline: 06/18/2024 at 10:00 AM PT, Online Q&A: Yes Response Types Cost File Response File Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Anticipated Final Selection July 25, 2024 Project Start July 29, 2024 Preferences DBE - Disadvantaged Business Enterprise EVMWD intends to award the construction contract in September 2024, anticipating completion no later than July 2026. EVMWD intends to award the construction management and observation services contract in July 2024, anticipating completion no later than December 2026.

Conceptual

Water / Sewer

$250,000.00

Public - County

Site Work

135

55

51

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
110
Bidding Soon
2,410
All Active Projects
1,072
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

img_map_placeholder

Multiple Locations, Lake Elsinore, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.