Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 13, 2025 at 8:00 PM
Updated March 14, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Plymouth, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of March 13, 2025 project was awarded to The Ruhlin Company, awarded amount is $10,089,220.90. Bridge Replacement, Us Route 224 Over Ohio Turnpike. The Small Business Enterprise (SBE) Goal applicable to this Project is 10%. Bids Will Be Received for This Project, Which Includes the Following: the Work to Be Performed Under the Contract for Project No. 43-24-10 Consists of the Demolition of the Existing Five-span Steel Beam Bridge at M.p. 227.6, Including Substructure, and Replacement With a Two-span Steel Beam Structure on Semi-integral Abutments and a Single Center Pier Support on Drilled Shafts. All Work is to Be Performed as Per the Plans, Drawings, Specifications, Special Provisions, Technical Specifications, and Other Contract Documents for This Project. The Small Business Enterprise (Sbe) Goal Applicable to This Project is 10%. Failure to Certify a Commitment to Meet the Sbe Goal or Failure to Satisfactorily Demonstrate Good Faith Efforts Used to Attain Sbe Participation for This Project Shall Be Grounds for the Commission to Consider the Bid Nonresponsive and May Cause the Bid to Be Rejected. The Commission Reserves the Right to Reject Any and All Bids and to Waive Minor Irregularities or Technical Deficiencies. Surfaces to be painted include, but are not limited to: beams and girders; cross girders; steel components of bearings, diaphragms, cross frames; structural steel utility supports; and non-galvanized structural mounted sign supports. The coating system to be applied is an organic (epoxy) zinc-rich primer, an epoxy intermediate coat, and a urethane finish coat (System OZEU). Field touch-up of the inorganic zinc-rich primer is to be performed with an organic (epoxy) zinc-rich primer. Bidders should submit all questions no later than seven (7) days prior to Bid Opening Question Deadline 01/08/2025 at 2:00 PM ET
Award
Bridges / Tunnels
$10,089,221.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 24, 2025
February 24, 2025
US-224, Plymouth, OH
Related To This Project
Plymouth, OH
--
Plymouth, OH
Bid Date: Nov 10 2023
Plymouth, OH
Bid Date: Sep 07 2023
Plymouth, OH
Bid Date: Mar 24 2023
Saint Clairsville, OH
Bid Date: Jun 12 2024
Hamilton, OH
Bid Date: Jun 26 2024
Westlake, OH
Bid Date: Jun 14 2024
Berea, OH
Bid Date: Jun 21 2024
Ottawa, OH
Bid Date: Jun 04 2024
Kent, OH
--
Cleveland, OH
Bid Date: Jun 05 2024
Portsmouth, OH
--
Stow, OH
Bid Date: May 28 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
