BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Saint Paul, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

LOCATION OF WORK The location of the project is: Site 1: East Rush Lake PWA, near 52253 Rush Lake Trail, Rush City, MN 55069 Site 2: North Center Lake PWA, near 14100 Lake Blvd, Center City, MN 55012 Site 3: Forest Lake #3 PWA, near 9467 N Shore Trail, Forest Lake, MN 55025 Term of Contract 1.1 Effective date: Work cannot commence before the date the State obtains all required signatures under Minn. Stat. 16C.05, subd. 2, whichever is later. The Contractor must not begin work under this Contract until this Contract is fully executed and the Contractor has been notified by the State to begin the work. 1.2 Expiration date: June 28, 2024, or until all obligations have been satisfactorily fulfilled, whichever occurs first. 1.3 Survival of terms: The following clauses survive the expiration or cancellation of this Contract: Indemnification; State Audits; Government Data Practices and Intellectual Property; Publicity and Endorsement; Governing Law, Jurisdiction, and Venue; and Data Disclosure. Any other Contract term that states it shall survive, shall survive. SCOPE The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary for the removal, squaring off and replacement of approximately 8,380 square feet of heavily cracked and broken asphalt areas in the parking lots of 3 (three) different Public Water Access sites located in Chisago and Washington Counties. The areas will be swept off and prepared for hot asphalt to be rolled to a smooth finish at 2-inches thick. The sites will be visited prior to the start of work to cover exact areas to repair. See maps on pages 26-28 of patch areas. LOCATION OF WORK The location of the project is: Site 1: East Rush Lake PWA, near 52253 Rush Lake Trail, Rush City, MN 55069 Site 2: North Center Lake PWA, near 14100 Lake Blvd, Center City, MN 55012 Site 3: Forest Lake #3 PWA, near 9467 N Shore Trail, Forest Lake, MN 55025 The work is to be performed on property owned by the State of Minnesota, Department of Natural Resources. All inquiries, information, and coordination with the Project Supervisor relating to the scheduling of work, use of site and similar matters shall be directed to: Rachel Henzen, Project Supervisor 1200 Warner Road St. Paul, MN 55106 Telephone: (651) 259-5875 E-mail: rachel.henzen@state.mn.us SCHEDULE / TIME OF COMPLETION Work cannot commence before receipt of Notice to Proceed. The project shall be substantially complete by June 14, 2024. Final Completion of the work shall be on or before June 28, 2024.

Award

Roads / Highways

$24,550.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
70
Bidding Soon
1,718
All Active Projects
597
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 24, 2024

June 14, 2024

June 28, 2024

img_map_placeholder

Multiple Locations, Saint Paul, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.