Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Ravensdale, Washington. Completed plans call for the renovation of a municipal facility.
Question Deadline 05/22/2024 at 12:00 PM PT Prospective bidders may request substitutions in writing on this form. Substitutions shall be submitted on this form via e-mail to: Brandon Snow, Senior Buyer. E-mail address: BSnow@cityoftacoma.org All e-mails must be received by Noon (12:00 pm) on Wednesday, May 22, 2024 The project consists of the remodel of restrooms, locker room, kitchen, lobby, mechanical room, server room and various other areas for finishes in the Headworks Operations Building. The project also includes the demolition of the existing Variable Air Volume (VAV) HVAC system (propane) and installation of a new Variable Refrigerant Flow (VRF) HVAC system (electric). Base bid of project shall include all necessary upgrades to electrical services and systems. This clock will be used as the official time of receipt of all parts of electronic bid submittals. For in person submittals, the City of Tacoma will designate the time of receipt recorded by the timestamp located at the lobby security desk, as the official time of receipt. Submittal Delivery: Sealed submittals will be received as follows: By Email: sendbid@cityoftacoma.org Maximum file size: 35 MB. Multiple emails may be sent for each submittal In Person: Tacoma Public Utilities Administration Building North, Main Floor, Lobby Security Desk 3628 South 35th Street Tacoma, WA 98409 Monday - Friday 8:00 am to 4:30 pm Estimate: $1,129,250.00 The City of Tacoma requires all employers to provide paid sick leave as set forth in Title 18 of the Tacoma Municipal Code and in accordance with State of Washington law. Americans with Disabilities Act (ADA Information: The City of Tacoma, in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. Specification materials can be made available in an alternate format by emailing the contact listed below in the Additional Information section. Title VI Information: "The City of Tacoma" in accordance with provisions of Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin in consideration of award. Additional Information: Requests for information regarding the specifications may be obtained by contacting Brandon Snow, Senior Buyer by email to BSnow@cityoftacoma.org. Protest Policy: City of Tacoma protest policy, located at online, specifies procedures for protests submitted prior to and after submittal deadline. The undersigned hereby agrees to substantially complete all the work under the Base Bid (and accepted alternates and/or unit prices) within 112 calendar days after the Notice to Proceed. The undersigned agrees to pay the Owner as liquidated damages the sum of $500 for each consecutive calendar day beyond the Substantial Completion date. Liquidated damages shall be deducted from the contract by change order. Each bid for construction must be accompanied either by a certified or cashier's check for 5 percent of the total amount bid, including tax, payable to the City Treasurer, or an approved bid bond, by a surety company authorized to do business in the State of Washington, for 5 percent of the total amount bid. The person legally authorized to sign the bid must sign all bid bonds. The approved bid bond form attached to these Specifications should be used: no substantial variations from the language thereof will be accepted. If a bid bond is used, the 5 percent may be shown either in dollars and cents, or the bid bond may be filled in as follows, "5 percent of the total amount of the accompanying proposal." The check of the successful Respondent will be returned after award of the Contract, acceptance of the Payment and Performance Bond and City's receipt of the signed Contract. The checks of all other Respondents will be returned immediately upon the award of the Contract. Bid bonds will not be returned. Except as modified by the Special Provisions, the Respondent to whom the Contract is awarded shall provide a payment and performance bond, including power of attorney, for 100 percent of the amount of his/her bid (including sales taxes), to insure complete performance of the Contract including the guarantee. The bonds must be executed by a surety company licensed to do business in the State of Washington. For a supply-type contract, a cashier's check or cash may be substituted for the bonds; however, this cash or cashier's check must remain with the City through the guarantee period and any interest on said amount shall accrue to the City. Anticipated Notice to Proceed: August 2024 Anticipated Substantial Completion Date: December 2024
Bid Results
Municipal
$878,797.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
23
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2024
July 11, 2024
36932 Green River Headworks Rd, Ravensdale, WA
Related To This Project
Ravensdale, WA
Bid Date: Jul 29 2024
Ravensdale, WA
Bid Date: Sep 18 2024
Ravensdale, WA
Bid Date: Sep 12 2024
Ravensdale, WA
Bid Date: Oct 22 2024
Ravensdale, WA
--
Ravensdale, WA
Bid Date: Jan 16 2024
Ravensdale, WA
Bid Date: Jun 10 2024
Ravensdale, WA
Bid Date: Jun 26 2023
Ravensdale, WA
Bid Date: Jun 15 2022
Ravensdale, WA
Bid Date: Jun 21 2022
Ravensdale, WA
Bid Date: Aug 30 2022
Port Orchard, WA
Bid Date: Jun 26 2024
Mount Vernon, WA
Bid Date: Jun 12 2024
Silverdale, WA
Bid Date: Jun 03 2024
Walla Walla, WA
Bid Date: Jun 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.