Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2024 at 8:00 PM

Updated June 19, 2024

Renovation of a water / sewer project in Spring City, Tennessee. Completed plans call for the renovation of a water / sewer project.

installing a variable frequency drive at the Piccadilly Pump Station. VFD will be used to control constant pressure of the water system and will be controlled through existing Mission Control Communications. Variable Frequency Drive Specifications: 25 HP 3 Phase 230 Volt 58 Full Load Amp Motor rating The work shall consist of supplying all labor, equipment and materials necessary to perform the work. The City reserves the right to accept and/or reject any and/or all bids.

Post-Bid

Water / Sewer

$720,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
71
Bidding Soon
1,013
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

July 1, 2024

Project location map

Multiple Locations, Spring City, TN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed