Site work, paving and outdoor lighting for a mixed-use development in Stockton, California. Completed plans call for site work for a sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.

DESCRIPTION OF THE WORK. Dock 12/13 requires the north dolphin to be vertical cut 16' down to the water line, approximately 16' tall x 4'thick X 25' wide, taken off the west side and a new structure wall to be poured in place with new fenders. A portion of the existing concrete and steel dock must be removed between dolphin 5 and 6, utilities maintained, and a new 8' diameter 1'' thick x 120' long mono pile needs to be driven to support a new 16'x16'x4' poured in place dolphin with fenders and bollard between dolphin 5 and 6 and the removed dock replaced with all utilities. The 172' X 6' treated wood walkway on the north will be removed and replaced by a new steel metal grate walkway with new handrail and lighting. This will be the basis for the low bidder. Add alternative will include removing a wood pile dolphin just east of Dock 14 on Rough and Ready Island and the second Add alternative will be for the other 3 wood pile dolphins in the vicinity. Another add alternative will be to remove all the treated wood piles under and around Dock 12/13 and south. Dock must be in operation and not delay shipping or traffic. Contractor to maintain utilities and provide safe temporary access for shipping, longshoremen and Port staff to all bollards and safety equipment. Work shall be finally completed within 60 calendar days from the date when Contract Time commences to run. Weekend work for shut downs and tie-ins is expected. REQUIRED CONTRACTORS LICENSE(S). A California A Contractor License is required to Bid this Contract. Joint ventures must secure a joint venture license prior to award of this Contract. Port specifically reserves the right, in its sole discretion, to reject any or all Bids, or rebid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work.

Award

Water / Sewer

$3,247,100.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

26

19

9

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
92
Bidding Soon
1,920
All Active Projects
800
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

July 19, 2024

img_map_placeholder

2201 W Washington St, Stockton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.