BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2024 at 8:00 PM

Updated August 10, 2024

Site work for a water / sewer project in Neah Bay, Washington. Completed plans call for site work for a water / sewer project.

The project consists of the removal of a derelict seafood processing pier and related debris: a 410-foot-long causeway, including decking approximately 16-feet wide and associated pilings and supports. a 60-foot by 170-foot wharf, and associated pilings and supports. approximately 24 additional pilings 50- to 200-feet away from the pier: 9 to the west and 15 to the east. the sunken wooden barge, BMS#12, approximately 120-feet by 38-feet, with (when floating) a 4-footdraft. This vessel is not salvageable and will need to be demolished. the sunken wooden-hulled fishing vessel, 'New Washington', estimated to be 70-feet long. This vessel is not salvageable and. will need to be demolished and disposed of in accordance with Programmatic Best Management Practices. Other sunken debris and materials within the project footprint. The estimated cost of the project is increased as indicated below: The estimated cost of the project is $2,990,600.00, and the required substantial completion date is February 1, 2025. The project is located at the Neah Bay, WA, 48.368280 lat, -124.617929 long. Online bidding for the submittal of your bid (which is required for this project) at $22.00 cost. The State reserves the right to accept or reject any or all proposals and to waive informalities. To do this work, the contractor must have adequate insurance to hold the State harmless, pay state prevailing wage rates, and have a Washington State Contractor's License. Pre-bid Directions: From Forks, WA: Head North on US-101 for 12 miles. Turn Left onto WA-113N in Sappho, WA. Continue for 10 miles, then Merge with WA-112 W. Continue for 26 miles, Makah Tribal Marina and parking will be on your Right . From Port Angeles, WA: Head West on US-101. Turn Right onto WA-112W, continue for 70 miles. Makah Tribal Marina and parking will be on your Right.

Award

Water / Sewer

$2,499,550.00

Public - State/Provincial

Site Work

6

15

14

9

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
62
Bidding Soon
1,195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 1, 2024

Project location map

1321 Bayview Ave, Neah Bay, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.