Site work and paving for a road / highway in Boon, Michigan. Working plans call for site work for a road / highway; and for paving for a road / highway.
2024 Hot Mix Asphalt Shoulder Milling and Paving HMA skip cold milling and shoulder paving of six wideningsin three locations, along US-10 in Lake and Osceola Counties. o Two widenings between Shepherd Rd and Timber Creek Drive, Lake County o Two widenings just west of 175th Ave, Osceola County o Two widenings between 60 th Ave and 80th Ave, Osceola County This work is contingent upon securing funding. No work should begin without a final approval from Kyle Knoop, Michigan Department of Transportation's Maintenance Coordinator. The contractor shall not begin this work until after June 10, 2024, and will begin this work no later than August 12, 2024. The contractor will have three continuous weeks to complete this work once work begins. Work shall take place only Monday through Thursday during daylight hours. Description of Work: In Lake County: o Cold milling 8' of the existing shoulder (3' paved, 5' gravel) to a depth of 2 inches as staked in two locations between Shepherd Rd and Timber Creek Drive then placement of LVSP, 13A or an approved alternative hot mix asphalt at a rate of 220#/syd including tacking all milled surfaces and double tacking vertical edges. o The eastbound paving length is 610' long and the westbound paving length is 715' long. In Osceola County: o Cold milling 8' of the existing shoulder (3' paved, 5' gravel) to a depth of 2 inches as staked on eastbound and westbound US-10 west of 175th Ave then placement of LVSP, 13A or an approved alternative hot mix asphalt at a rate of 220#/syd including tacking all milled surfaces and double tacking vertical edges. o Both eastbound and westbound paving lengths are 1100' long. o Placing 5' width of LVSP, 13A or an approved alternative hot mix asphalt at a rate of 220#/syd including tacking double tacking vertical edges on a shoulder aggregate surface to be graded by others. o There is 1700' of paving on westbound US-10 between 60th and 65th Ave and 1800' of paving on eastbound US-10 between 70th and 80th Ave. o Please provide three working days (Monday through Thursday) notice to allow for others to grade prior to paving. Milling and paving limits have been staked by others. Provide single lane closures maintained with traffic regulators in accordance with the attached detail with a maximum closure length of two miles. Work shall be performed in accordance with MDOTs 2012 Standard Specifications for Construction. Coordination Clause: The Contractor is advised that other projects in the vicinity may be under construction during the life of this contract. The Contractor is reminded of the requirements in Section 104.08 of the 2012 Standard Specifications for Construction to cooperate with other contractors, utility companies and public agencies. Insurance: Insurance Requirements are as per MDOT 2012 Standard Specifications for Construction.
Final Planning
Roads / Highways
$320,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2024
Multiple Locations, Boon, MI
Related To This Project
Boon, MI
Bid Date: May 29 2024
Boon, MI
--
Boon, MI
Bid Date: Jun 10 2024
Boon, MI
Bid Date: Jun 12 2024
Boon, MI
--
Boon, MI
Bid Date: Aug 15 2024
Boon, MI
Bid Date: May 22 2024
Boon, MI
Bid Date: May 15 2024
Boon, MI
Bid Date: Mar 06 2019
Boon, MI
Bid Date: Apr 30 2024
Boon, MI
Bid Date: May 08 2024
Boon, MI
Bid Date: Apr 29 2024
Boon, MI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.