Site work and paving for a road / highway in Boon, Michigan. Working plans call for site work for a road / highway; and for paving for a road / highway.

2024 Hot Mix Asphalt Shoulder Milling and Paving HMA skip cold milling and shoulder paving of six wideningsin three locations, along US-10 in Lake and Osceola Counties. o Two widenings between Shepherd Rd and Timber Creek Drive, Lake County o Two widenings just west of 175th Ave, Osceola County o Two widenings between 60 th Ave and 80th Ave, Osceola County This work is contingent upon securing funding. No work should begin without a final approval from Kyle Knoop, Michigan Department of Transportation's Maintenance Coordinator. The contractor shall not begin this work until after June 10, 2024, and will begin this work no later than August 12, 2024. The contractor will have three continuous weeks to complete this work once work begins. Work shall take place only Monday through Thursday during daylight hours. Description of Work: In Lake County: o Cold milling 8' of the existing shoulder (3' paved, 5' gravel) to a depth of 2 inches as staked in two locations between Shepherd Rd and Timber Creek Drive then placement of LVSP, 13A or an approved alternative hot mix asphalt at a rate of 220#/syd including tacking all milled surfaces and double tacking vertical edges. o The eastbound paving length is 610' long and the westbound paving length is 715' long. In Osceola County: o Cold milling 8' of the existing shoulder (3' paved, 5' gravel) to a depth of 2 inches as staked on eastbound and westbound US-10 west of 175th Ave then placement of LVSP, 13A or an approved alternative hot mix asphalt at a rate of 220#/syd including tacking all milled surfaces and double tacking vertical edges. o Both eastbound and westbound paving lengths are 1100' long. o Placing 5' width of LVSP, 13A or an approved alternative hot mix asphalt at a rate of 220#/syd including tacking double tacking vertical edges on a shoulder aggregate surface to be graded by others. o There is 1700' of paving on westbound US-10 between 60th and 65th Ave and 1800' of paving on eastbound US-10 between 70th and 80th Ave. o Please provide three working days (Monday through Thursday) notice to allow for others to grade prior to paving. Milling and paving limits have been staked by others. Provide single lane closures maintained with traffic regulators in accordance with the attached detail with a maximum closure length of two miles. Work shall be performed in accordance with MDOTs 2012 Standard Specifications for Construction. Coordination Clause: The Contractor is advised that other projects in the vicinity may be under construction during the life of this contract. The Contractor is reminded of the requirements in Section 104.08 of the 2012 Standard Specifications for Construction to cooperate with other contractors, utility companies and public agencies. Insurance: Insurance Requirements are as per MDOT 2012 Standard Specifications for Construction.

Final Planning

Roads / Highways

$320,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
193
All Active Projects
88
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.