BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 18, 2024 at 8:00 PM

Updated May 31, 2024

Renovation of an educational facility in Millington, Michigan. Completed plans call for the renovation of a educational facility.

Replace existing isolation valves on heating-only hydronic equipment (e.g, fin tube radiation, unit heater, cabinet unit heater, etc.) with new quarter-turn ball valve in an accessible location either within the cabinet or immediately adjacent to the cabinet. Valve size for unit pricing shall be 3/4". Include all labor and materials for replacement of one valve on the hydronic supply piping and one valve on the hydronic return piping. Reference Paragraph 1.4 Procedures above in this Specification Section for what is to be included in the Unit Cost. All questions regarding the plans and specifications are to be e-mailed to Justin Woolwine, Serenus Johnson Construction at jwoolwine@serenusjohnson.com and copy Dan Seguin at dseguin@serenusjohnson.com. Final questions/RFIs will be accepted until Friday, May 24, 2024 at 12:00PM. Project Number - 23706.00 New Chiller System for Meachum Elementary School.

Post-Bid

Educational

$167,000.00

Public - City

Renovation

28

15

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
79
Bidding Soon
2,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 1, 2024

Project location map

8537 Gleason St, Millington, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.