Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 21, 2025 at 8:00 PM
Updated March 22, 2025
Demolition, site work and addition to a mixed-use development in Millington, Michigan. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
Addition to Millington Jr/Sr High School PROJECT LOCATION 8780 Dean Drive Millington, MI 48746 Phone (989) 660-2432 Fax: (989) 660-2443 Complete proposals will be received for the following work categories, in accordance with drawings and specifications as prepared by the Project Manager, Engineers and Architect. If a contractor elects to bid more than one category, then a separate proposal form must be submitted for each category. Bid proposals will be received from trade contractors submitting only complete bids against a bid category. All other subcontractors and suppliers shall submit their bids to the trade contractors. All bids received after the bid due time on the bid due date will not be accepted. Proposals must be submitted as specified in the "Invitation for Bids." The successful selected Bidder for each category will be required to furnish a cost breakdown for their respective bid category. Each bid category will be required to furnish separate costs on the schedule of values, as part of your pay application, for each type of work. Question Deadline 01/24/2025 at 12:00 PM ET All questions regarding the plans and specifications are to be e-mailed to Justin Woolwine, Serenus Johnson Construction at jwoolwine@serenusjohnson.com and copy Dan Seguin at dseguin@serenusjohnson.com. Final questions/RFI's will be accepted All interpretations or supplemental instructions will be in form of written addenda e-mailed prior to date of bid opening. Copy of such addenda will be distributed via the Millington Community Schools District online. Each bid that exceeds Fifty Thousand Dollars ($50,000) must be submitted with an attached certified check or bid bond from a surety company approved to do business in the State of Michigan, payable to the Owner in an amount not less than five percent (5%) of the base bid. 100% Labor, Material & Performance Bonds will be required for this project, from the accepted bidder. See bid form for add to base bid. Certificate of Insurance will be required from the accepted bidder, per bid specification Bids may not be modified or withdrawn for a period of sixty (60) days after the bid date. Bids submitted prior to the designated time of bid may be withdrawn by notice to the party receiving bids. Notice shall be in writing over the signature or in person. Withdrawal notice shall be submitted on or before the date and time for receipt of bids. Withdrawn bids may be resubmitted up to the time designated for the receipt of bids. Proposals may be rejected if they do not include a bid amount, PLM Bond cost, bid bond, noted addenda (if any), noted alternates (if applicable), percentages for changes in the work scope, unsigned proposal form and/or any other missing information. Proposals that contain qualifications and/or modifications to the base proposal may also be rejected. The Owner reserves the right to reject any or all bids in whole or in part and waive any informality herein. Signatures must be in long hand and executed by the principal duly authorized to make contracts. The bidder's legal name must be fully stated. Only bids for COMPLETE Bid Categories will be accepted. The Project Manager reserves the right to accept/reject bids received for partial categories or noting any exceptions. Bidders shall include all work noted in the Bid Category Description. By submitting a completed Bid to the Owner, the Bidders are acknowledging that they have read and understand the Bidding Documents. Serenus Johnson Construction is the Project Manager for this project. The Project Manager reserves the right to accept/reject any, part of any, or all bids and to waive all informalities in the bidding procedures. The Project Manager reserves the right to accept/reject any bid when the Bidder fails to submit data requested by the Bidding Documents, or if the bid is submitted incomplete or irregular. No telephonic, e-mail, fax bids or modification to a submitted bid will be received or considered by the Project Manager. 22052.00, 24-736-043, 24113
Post-Bid
Educational
$700,000.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
June 6, 2025
8780 Dean Dr, Millington, MI
Related To This Project
Millington, MI
Bid Date: Apr 04 2025
Millington, MI
Bid Date: Jan 10 2025
Millington, MI
--
Millington, MI
Bid Date: Jul 15 2024
Millington, MI
Bid Date: May 30 2024
Millington, MI
Bid Date: Nov 29 2023
Byron Center, MI
--
Byron Center, MI
--
Charlotte, MI
Bid Date: Jan 22 2025
Escanaba, MI
Bid Date: Feb 04 2025
Plymouth, MI
Bid Date: Jan 22 2025
Saugatuck, MI
Bid Date: Mar 13 2025
Clinton Twp, MI
Bid Date: Jan 22 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
