BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2024 at 8:00 PM

Updated August 21, 2024

Site work for a water / sewer project in Glen, Mississippi. Completed plans call for site work for a water / sewer project.

Contract A - 2020 Rural Development Glen Water Treatment Plant Redesign The Project includes the following Work: Installation of a control system internal to the plant that will start/stop: 1) existing wells that feed raw water to the plant; 2) an induced-air aeration unit; 3) chemical feed pumps; 4) control the internal functioning of package plant treatment units; 5) high service pumps 6) a backwash pump. Installation of an induced-air aerator. Installation of duplex peristaltic chemical feed pumps to feed potassium permanganate, hypochlorite (NaOCl) sodium hydroxide (NaOH) and polyphosphate. Installation of a post-aeration in-line static mixer and internal plant piping and valves. Installation of two 0.5 MGD parallel pre-manufactured treatment units each consisting of a tube sedimentation basin and a green-sand filter. Installation of five 650-gallon bulk chemical storage tanks, one 300-gallon bulk chemical storage tank and six 35-gallon chemical day tanks. Construction of poured in-place reinforced concrete chemical containment area. Construction of poured in-placed reinforced concrete clear-well. Installation of two 525 gpm vertical turbine high-service pumps. Installation of one 1,200 gpm vertical turbine backwash pump. Construction of a 90X100 premanufactured metal building with associated doors, mechanical conditioning systems and lighting to house the package plant units, chemicals storage tanks, chemical feed pumps, chemical storage tanks, finished water pumps, backwash pump and a motor control center. Construction of a reject water storage pond. Finished grading, paving and fencing of a partially graded and fully cleared site. Installation of yard piping, power cabling and communication cabling between the existing water treatment plant and the new water treatment plant. Owner anticipates that the Project's total bid price will be approximately $7,500,000. The Project has an expected duration of 540 days. Direct all questions in writing to Hethcoat & Davis, Inc. at the address noted above. Question Deadline 06/19/2024 Submit question in writing to the attention of: Alton Hethcoat, P.E, Hethcoat and Davis, Inc. 278 Franklin Road, Suite 200, Brentwood, Tennessee 37027. Questions received less than seven days prior to the date for opening of Bids may not be answered. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

Award

Water / Sewer

$7,948,000.00

Public - County

Site Work

71

37

13

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
283
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

August 26, 2024

Project location map

540 Co Rd 300, Glen, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.