BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Oklahoma City, Oklahoma. Completed plans call for site work for a water / sewer project.

Tinker Sewer Mains and Lift Station Elimination, Southwest Area, Phase I. Scope - Provide a study and engineering report for the phasing of eliminating sewer lift stations in the Southwest Area of Tinker Air Force Base (TAFB). The Oklahoma Water Utilities Trust (OCWUT) owns and operates the wastewater system on TAFB, excluding the privatized Family Housing area. The wastewater system consists of approximately 25 miles of sewer mains, 470 manholes, and 57 lift stations. Most of the sewer mains on TAFB have diameters less than 15 inches and are vitrified clay pipes. The Southwest Area, as shown in Attachment B. consists of approximately 5.5 miles of sewer main that is conveyed north to a 36- inch sanitary sewer interceptor near SE 29th Street and Sooner Road. There are approximately 38 lift stations in the Southwest area. The fixed Limit ofConstruction Cost is $20,000,000. The Southwest Area, as shown in Attachment B. consists of approximately 5.5 miles of sewer main that is conveyed north to a 36- inch sanitary sewer interceptor near SE 29th Street and Sooner Road. There are approximately 38 lift stations in the Southwest area. Question Deadline May 21, 2024 at 10:00 AM The fixed Limit of Construction Cost is $20,000,000. Timeline: An approvable engineering report w ill be required within 200 days from the issuance of the notice to proceed. An amendment may be issued for plans and specifications after OCWUT receives the engineering report. Letters of Interest must provide your understanding of the project and scope of services; your approach and concept; designation of your Project Team and their detailed expertise and experience on similar projects, and accessibility to City staff. The Consultant may not change the Project Team without prior consent of the City Engineer. Letters of Interest must be 50 pages or less. Please provide a contact name and email address in your Letter of Interest. The City and its related Trusts use the Contract located Contract terms are not negotiable. The City may negotiate Scope of Work, Compensation, and Additional Services. If the City or Trust determines, in its sole discretion, the City or Trust is not able to timely negotiate an acceptable Scope of Work, Compensation, and Additional Services with the selected Consultant, then the City or Trust may terminate such negotiations and commence negotiation with another Consultant.

Post-Bid

Water / Sewer

$20,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
418
All Active Projects
195
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 4, 2024

img_map_placeholder

To Be Determined, Oklahoma City, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.