EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a road / highway in Dudley, Massachusetts. Completed plans call for site work for a road / highway.

Quinebaug Valley Rail Trail Improvements will include construction of a new 5-mile segment of the QVRT multi-use trail including approximately 21,000 linear ft. along an abandoned rail line and approximately 5,250 LF on-road as a separated path with sections of "share the road" bicycle lane accommodations with associated improvements and site furnishings. MassDOT prequalification of contractors with the class of work as, Highway Construction, for the project with an estimated value of $4,170,439.35 will be required. Question Deadline 06/12/2024 All questions about the meaning or intent of the Bid Documents shall be submitted via email to the Engineer in writing at the following address: Jef Fasser BSC Group 803 Summer Street Boston, MA Attention: Jef Fasser, Email: jfasser@bscgroup.com In order to receive consideration, questions must be received by The Owner at least three days prior to the date fixed for the opening of Bids The Town reserves the right to reject any and all bids, to negotiate any and all contract terms with the successful proposer, or to cancel this proposal at any time if it is in the Town's best interest to do so. Any contract agreement must be approved by the Southbridge Town Council.

Award

Roads / Highways

$3,912,763.00

Public - City

Site Work

31

10

14

3

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Multiple Seating, Pews and Benches, Benches
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Planting, Turf and Grasses, Plugging
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
200
Bidding Soon
3,450
All Active Projects
1,527
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

August 23, 2024

img_map_placeholder

24 Railroad Ave, Dudley, MA


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Quinebaug Valley Rail Trail Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.