Site work for a water / sewer project in Carmel, Indiana. Completed plans call for site work for a water / sewer project.

Six Points Road Water Main Extension. The installation of approximately 2,545 feet of 12-inch HDPE water main by horizontal directional drill installation, 45 feet of 12-inch ductile iron water main by open cut installation, along with related fittings, hydrants, valves, appurtenances, restoration, and other incidental work necessary for a complete installation. All Bid Bonds and certified checks of unsuccessful bidders will be returned by the Owner upon selection of the successful Bidder and execution of the Agreement, and provision of the required Performance Bond and Payment Bond. A Performance Bond with a good and sufficient surety, acceptable to the Owner and Engineer, shall be required of the successful Bidder in an amount equal to at least one hundred percent (100%) of the Contract Price, conditioned upon the faithful performance of the Agreement. The Contractor shall execute a Payment Bond to the Owner, approved by Owner and Engineer and for the benefit of the Owner, in an amount equal to one hundred percent (100%) of the Contract Price. Bidders are notified that there is a 7% MBE and 5% WBE participation goal on this project. The Owner reserves the right to reject and/or cancel any and all Bids, solicitations and/or offers in whole or in part as specified in the solicitation when it is not in the best interests of the governmental body as determined by the purchasing agency in accordance with IC 5-22-18-2. The Owner also reserves the right to waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner. Select order of Work and establish schedule or working hours for construction, subject to approval of Engineer which will assure orderly and expeditious progress of Work. B. Maintain existing service affected by Contractors' operations under the contract. Schedule construction to minimize interruptions to existing services, and inconveniences to others. C. Coordinate with various Transmission Main Owners for crossings of mains in the vicinity of Six Points Road North of Main Street.

Award

Water / Sewer

$499,350.00

Public - City

Site Work

14

5

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
81
Bidding Soon
730
All Active Projects
390
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2024

July 19, 2024

img_map_placeholder

Multiple Locations, Carmel, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.