Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Springfield, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge repairs, bridge widening, bridge deck removal and replacement on SN 084-0018 and 084-0019 carrying I-55 over the Sangamon River, 2.2 miles south of Business I-55 Sherman Interchange. Region 4 District 6 Federal Project # NHPPD2C1(426) County(S) Sangamon Key Route(S) FAI 55 Marked Route(S) I-55 Section(S) (84-2BR-1)D,BY,BP,BRR State Job #(s) C-96-027-19 PPS #(S) 6-00200-0300 Project Labor Agreement 220 Working Days Questions not accepted as of June 04, 2024 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, May 24, 2024. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 140 - Bridge Repairs, Bridge Widening, Bridge Deck Removal and Replacement Description: This work shall consist of removal and proper disposal of the existing bearings at locations shown in the plans according to Article 501.05 of the Standard Specifications and the Jack and Remove Existing Bearings special provisions. Basis of Payment: This work will be paid for at the contract unit price EACH for REMOVAL OF EXISTING BEARINGS, which price shall include all equipment, materials and labor required to satisfactorily complete the work. The jacking and cribbing required to remove the load from the existing bearings is not included as part of this work but is included in payment for jacking existing superstructure. This project is located on I-55 at the Sangamon River, 2.2 miles south of I-55 BUS at the Sherman Interchange or 2.7 miles north of IL 54/Sangamon Avenue. This work consists of tree removal, bridge repairs and widening, bridge deck removal and replacement (SN 084-0018 and 084-0019), milling and resurfacing HMA pavement and shoulders, guardrail and temporary concrete barrier improvements, pavement marking, and all other necessary collateral work to complete the contract.
Award
Bridges / Tunnels
$29,560,161.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 14, 2024
August 13, 2024
I-55, Springfield, IL
Related To This Project
Springfield, IL
Bid Date: Jun 14 2024
Springfield, IL
Bid Date: Jun 13 2024
Springfield, IL
Bid Date: Jun 13 2024
Springfield, IL
Bid Date: Jun 20 2024
Springfield, IL
Bid Date: Jun 13 2024
Springfield, IL
Bid Date: Jun 13 2024
Springfield, IL
Bid Date: May 28 2024
Springfield, IL
Bid Date: Jun 14 2024
Springfield, IL
Bid Date: Jun 14 2024
Springfield, IL
Bid Date: Jun 14 2024
Springfield, IL
Bid Date: Jun 14 2024
Springfield, IL
Bid Date: Jun 14 2024
Springfield, IL
Bid Date: Jun 14 2018
Springfield, IL
Bid Date: Jun 17 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.