BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2024 at 8:00 PM

Updated July 14, 2024

Site work for a road / highway in Las Vegas, Nevada. Completed plans call for site work for a road / highway.

Type: District-1 Contract Cost Range: R23 ($3,200,000.01 to $3,850,000) Funding Type: State County(s): Clark Enterprise Goal: 7% Location: I-515 from CC 215 and SR 564, Lake Mead Parkway to I-15 Interchange and US 95 from junction at I-15 Interchange to SR 157, Kyle Canyon Road Work Description: sign design and construction Project Manager: Dennis Faulkner Resident Engineer: Doucet, Susan Route(S): I-515 and Us 95 Milepost(S): Cl 61.500 to 75.837 and Cl 75.660 to 93.000 Contract Days: 140 (Working) Liquidated Damages: $5,300.00 This project has a Small Business Enterprise (SBE) Goal of 7.00% , MBE (13.9%), WBE (6.9%), NVDOT - Sign Design and Construction *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Submission Note- . No bids can be accepted after the time set for opening bids. Electronic bids cannot be submitted to the vault after the bid opening time. NDOT cannot make any exceptions due to bidder's internet services or any other emergency situations. This project consists of installing traffic sign panels on I-11, Clark County, designation from I-515, Clark County, Lake Mead Parkway to I-15 Interchange Milepost 61.500 to 75.837 and US 95, Clark County, Junction at I-15 to SR-157 Kyle Canyon Road Milepost 75.660 to 93.000. There are 140 working days for this project. The traffic control for this project will consist of detours, lane closures, shoulder closures, and ramp closures. Manufacture, fabrication, assembling, handling, erection, installation, dismantling, conditioning, adjustment, alteration, repairing and servicing of all ferrous or nonferrous metal work and all other materials used in lieu thereof and of all HVAC systems, air veyor systems, exhaust systems, and air-handling systems regardless of material used including the setting of all equipment and all reinforcements in connection therewith; (b) all lagging over insulation and all duct lining; (c) testing and balancing of all air handling equipment and duct work; (d) the preparation of all shop and field sketches whether manually drawn or computer assisted used in fabrication and erection, including those taken from original architectural and engineering drawings or sketches; (e) metal exterior wall systems, metal roofing and underlayment regardless of material used; (f) any and all auditing, commissioning and testing, of all HVAC in connection with a building rating methods; detailing, shop fabrication, field installation and performance oriented tasks and (g) all other work included in the jurisdictional claims of International Association of Sheet Metal, Air, Rail and Transportation Workers

Award

Roads / Highways

$2,877,630.00

Public - State/Provincial

Site Work

240

15

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
31
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

August 12, 2024

Project location map

I-515, Las Vegas, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.