BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a transportation facility in Blountville, Tennessee. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

Each proposal must be accompanied by a bid bond from a Surety Company acceptable to the Owner or a cashier's check or certified check made payable to the TriCities Airport Authority for not less than 5 percent of the total amount of the bid. A 100% contract bond will be required upon successful bid as part of the execution of the project contracts. Proposals/bids are required to remain open for acceptance or rejection for the duration outlined in General Contract Provisions 30-02, but the Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any and/or all bids, to waive any informalities and technicalities in the bids received, to the extent permitted by applicable law, and to accept any bid which, in its sole discretion, is in the best interest of the Owner. The proposed project consists of three elements. The first is the approximate 1,250' extension of Taxiway A. The proposed extension provides a direct taxi route for aircraft to the Runway 23 end which will improve safety by minimizing unnecessary taxiway diversions as well as providing additional parking/maneuvering area around the passenger concourse. The second element isthe removal of the portion of Taxiway C between Taxiway A and Runway 5-23 due to the direct access and potential "hot spot" that this section of taxiway creates. Finally, the Project will improve the runway safety area grading at the Runway 5 end, near the Wheeler Cemetery, to bring safety area grades into compliance with FAA Advisory Circular recommendations.

Award

Transportation Terminals

$7,375,279.00

Public - Federal

Addition, Demolition, Renovation, Site Work

85

9

2

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
13
Bidding Soon
373
All Active Projects
157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

September 1, 2024

img_map_placeholder

2525 TN-75, Blountville, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.