Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work and renovation of an educational facility in Ray, Michigan. Completed plans call for the renovation of a educational facility.

As of May 5th, 2025 this project is pending site plan approval by the city. A construction manager has been confirmed. This project is expected to be advertised for sub bidding purposes in July/August of 2025. Project work includes: Safety and Security Improvements - Install a fire alarm system - Install a security camera system - Install a two-way phone system - Install a clock system - Install a card access system - Add new LED sign in front of the building - Repave the drop-off/pick-up loop - Install security boot system on office and classroom doors - Install safety glass film on windows Mechanical/Electrical/Plumbing Improvements - Replace air handling units in the kitchen - Renovate the kitchen into a warming kitchen - Replace water piping - Replace air conditioning units in offices - Replace air handling units in the gym, cafeteria, faculty resource room, and speech and social work rooms - Replace water treatment tanks and system - Replace water fountains - Replace temperature controls - Replace boiler systems - Add air conditioning to all classrooms - Replace classroom ventilators - Update geothermal well field - Replace electrical panels - Replace building electric service - Expand the electrical system to support technology Learning Environment / Technology Improvements - Remodel office walls, floors, and ceilings - Remove asbestos floor tile - Replace classroom floor, ceiling tiles, and grid - Replace corridor doors, frames, and hardware in the original building - Renovate restrooms (replace partitions, fixtures, and finishes) - Replace and fireproof corridor walls in the original building - Remodel the kitchen (walls and floor) - Update lighting and controls - Purchase student technology devices, printers, and instructional audio/visual systems - Replace classroom furniture Exterior Improvements - Replace select areas of the roof (front entrance, gym and cafeteria, and shingle roof) - Replace all exterior windows in the original section of the building - Replace soffit and fascia Athletic/Site Improvements - Install a new control system for the septic field - Update playground equipment and add soft- and hard-surface play areas - Replace select sidewalks and curbs - Repave the parking lot As of February 7, 2025 this project is in the pre-construction phase. A construction manager has been selected for the bond projects. Information regarding a design team has not been disclosed. Bidding is expected to be done through competitive bid with public bid openings. A firm timeline for construction has not been disclosed.

Post-Bid

Educational

$10,000,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
149
Bidding Soon
2,116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

August 25, 2025

Project location map

24125 26 Mile Rd, Ray, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.