Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 2, 2025 at 7:00 PM
Updated January 3, 2025
Site work for a pipeline in Palo Alto, California. Conceptual plans call for site work for a pipeline.
This project replaces approximately 22,300 linear feet (which represents 2.0 percent of the Citys Gas Distribution System) of leaking, inadequately-sized, and structurally deficient gas mains and services located on various streets in the Midtown, Palo Verde, Greenmeadow, and Evergreen Park neighborhoods. Staff identifies problematic mains/services by researching maintenance and leak histories, analyzing performance of the entire gas distribution system, and considering risks ratings of the Distribution Integrity Management Plan Project is included in the City of Palo Alto's Fiscal Year 2025-2029 Capital Improvement Program (CIP). As of January 2, 2025, information regarding a design team or a general contractor is not available. Design and construction is anticipated in 2026/2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Pipeline
$3,140,226.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
Multiple Locations, Palo Alto, CA
Related To This Project
Palo Alto, CA
--
Palo Alto, CA
Bid Date: Jun 06 2024
Palo Alto, CA
--
Palo Alto, CA
Bid Date: Jun 18 2024
Palo Alto, CA
--
Palo Alto, CA
--
Palo Alto, CA
--
Palo Alto, CA
--
Palo Alto, CA
Bid Date: Apr 01 2020
Palo Alto, CA
Bid Date: May 21 2024
Palo Alto, CA
--
Palo Alto, CA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
