BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a development in Flagstaff, Arizona. Completed plans call for site work for a development.

This item shall consist of excavating, backfilling, and site grading in accordance with these specifications and as shown on the drawings, to the lines and grades established. This specification includes clearing and grubbing, conserving top soil, safety, shoring and protection, excavation, removal of water, backfill, compaction of material, waste material disposal, surface restoration, and finish and area cleanup. Question Deadline 05/28/2024 Submit Questions to: Michael.carico@usda.gov Lifting or moving the building by a qualified building mover. Removing existing foundations. Installing a foundation consisting of CMU stem walls & pedestals over strip & spot footings placed at frost depth Replacing deteriorated stud bases, rim joists and joist ends with new lumber. Sistering and supplementing all floor framing with laminated venner lumber so that intermediate foundation elements are minimized. Resetting the buidling at a higher elevation so that perimeter wood framing is a minimum of 8" above exterior grade and interior floor joists are at least 18" above the earth in the crawlspace. Provide positive drainage away from building Mormon Lake Guard Station Cabin Foundation Stabilization - Coconino National Forest- Flagstaff Ranger District Magnitude of This Project is Between $100,000 and $250,000 This Acquisition is a Total Small Business Set-aside Naics Code: 238190 Davis-bacon Wages Apply - See Attached Wage Determination Submit Questions by May 28, 2024 to: Michael.carico@usda.gov Vendors Must Be Registered in the System for Award Management (Sam) (Www.sam.gov) to Be Eligible for Award of a Federal Contract (Note: Registration is Free on This Government Site) The Contractor shall begin performance within 10 calendar days and complete it within 120 calendar days after receiving *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Conservation and Development

$250,000.00

Public - Federal

Site Work

14

11

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
115
All Active Projects
52
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 5, 2024

July 5, 2024

img_map_placeholder

1824 S Thompson St, Flagstaff, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.