BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Elgin, Illinois. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The proposed improvement includes removal of existing playground and surfacing, concrete paving, curb, playground safety surfacing, underdrainage and all other appurtenant work and materials necessary to complete the project. An original bid bond (in the amount of 5% of the original bid amount) must be delivered to the City of Elgin Purchasing Department, 150 Dexter Court. The bid bond with surety satisfactory to the City, in either surety bond, cash, certified check, cashier's check, or bank money order on a solvent bank shall be made payable to the City of Elgin, Illinois. The sum shall be forfeited in the case the successful bidder fails to enter into a binding contract and provide a properly executed surety bond within 15 days after the date the contract is awarded by the City Council. The bidder shall submit a list of qualified references for projects of similar size and scope of this project. Proposals withdrawn may not be re submitted at the same letting. Each bidder shall satisfy the City as to their ability, financially or otherwise, to carry out the work. The City of Elgin reserves the right to reject any and all bids and/or to waive any informality in any bids. The successful bidder shall be required to furnish a satisfactory contract bond to the City of Elgin by a surety company authorized to do business in the State of Illinois covering the full amount of the contract. The successful bidder shall pay prevailing wage, shall provide certified payrolls to the City for the duration of the project and comply with the Responsible Bidder's Ordinance and Elgin Residency Ordinance for the duration of the project. Question Deadline 06/03/2024 at 3:00 PM CT

Award

Playgrounds / Parks / Athletic Fields

$539,352.00

Public - City

Paving, Site Work

16

17

9

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
101
Bidding Soon
2,079
All Active Projects
888
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

July 8, 2024

img_map_placeholder

1985 Powder River Path, Elgin, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.