BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Site work and paving for a road / highway in Pillager, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

UPDATE:Resurface and improve 8.5 miles of Hwy 210 from Hwy 10 in Motley to River St. (S Cass Co. Rd. 1) in Pillager; includes roundabout in Pillager. Work is scheduled for 2027. Pillager, Cass County. Work in Pillager, Cass County. Select image to enlarge Summary of work Pillager Construct a single-lane roundabout at the intersection of Hwy 210, River St. (S Cass Co. Rd. 1) and 37th Ave. Motley to Pillager Resurface road (asphalt), includes shoulders and turn lanes Replace box culvert east of 49th Ave. SW Restripe eastbound Hwy 210 to make left turn-lane to northbound Hwy 64 Project is in Minnesota Department of Transportation - District 3 capital budget fy 2025 -2029 CIP ___________________________________________________________________________________________________ Pillager/Highway 210 roundabout meeting is May 22 The Minnesota Department of Transportation invites the community to learn about plans to improve Highway 210 from Motley to Pillager, Cass County, on Wednesday, May 22. The open house will take place from 5 to 7 p.m. at the Pillager Community Center, 207 East Second Street, near the Pillager Fairgrounds. Guests will have the opportunity to visit with project staff, view design layouts and ask questions. To better fit individual schedules, the event is drop-in style—guests may arrive and leave at their convenience. MnDOT will resurface and improve nearly nine miles of Highway 210 from Highway 10 in Motley to east of south junction Cass County Road 1 in Pillager; replace a box bridge east of 49th Avenue SW; and install a new roundabout on Highway 210 at south junction Cass County Road 1 (River Street) and 37th Avenue in Pillager. The project is currently in the design phase and scheduled for construction in 2027. When complete, travelers will benefit from a smoother road surface, improved safety, access and traffic flow, especially at peak hours. For more information, contact Kelly Hoppe, project development manager, at kelly.hoppe@state.mn.us or 218-537-6220 or visit the Highway 210 project web page: www.mndot.gov/d3/projects/pillager.

Conceptual

Roads / Highways

$9,700,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
452
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.