BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Costa Mesa, California. Completed plans call for site work for a educational facility.

Scope of Work: - Identify and protect all existing irrigation, plumbing, and other landscaping components in the work area. - Minimize debris generation during removal using debris containment measures where necessary. - Remove approximately 18,500 square feet of sod between hash marks (Newport Harbor High School only) - Install approximately 18,500 square feet of sod between hash marks (Newport High School only). - Hollow Tine Aeration 4-to-5-inch depth in two directions (at both sites) - Verti-cut/dethatch square footage listed below of field project areas at each site. - Newport Harbor High School (approximately 44,500 square feet of field area outside of hash marks) - Costa Mesa (approximately 80,000 square feet) - Import topdressing sand to each project site (amounts listed below). - Newport Harbor High School (approximately 50 tons) - Costa Mesa High School (approximately 100 tons) - Laser level topdressing sand throughout playing surfaces ensuring smooth surfaces at both sites. - Hydroseed with Sportsfield Elite blend from Stover Seed at 12 pounds per 1,000 square feet at both sites. - Ensure a clean and finished appearance with proper alignment and edge details. - Maintain a clean and safe work area throughout the project duration. - Conduct a thorough clean-up of both project areas, removing all dust, debris, and construction materials. - Conduct a final walk-through with the Newport Mesa Unified School District representative to address any issues Athletic Turf Restoration. Question Deadline 05/31/2024 at 4:00 PM PT Online Q&A Yes Liquidated Damages $750/Day Start/Delivery Date 6/2024 Project Duration 60 Days Estimated Bid Value $160,000 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Scope of Services This project involves the restoration of the high school football practice field at Newport Harbor High School located at 600 Irvine Ave., Newport Beach, CA. 92663 and high school soccer field at Costa Mesa High School located at 2650 Fairview Rd., Costa Mesa, CA. 92626. This scope includes the fields at both sites.

Award

Educational

$181,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
113
Bidding Soon
2,438
All Active Projects
958
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

July 5, 2024

img_map_placeholder

Multiple Locations, Costa Mesa, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.