Published September 5, 2025 at 8:00 PM
Updated September 6, 2025
Site work and renovation of a civil project in Oneida, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Project Owner Number: BE-19-K56 and 15-002 The Project includes, but not limited to, the following proposed work: Construction of an approximate 43 by 54 double-wall CMU block pump house containing a 10-foot diameter by 18-foot long pressure filter vessel; Construction of a 15-foot by 53.5-foot (interior dimensions) below grade cast-in-place concrete tank; Provision and installation a control system including variable frequency drives, electrical wiring, and appurtenances; Provision and installation of a chemical feed system containing sodium hypochlorite and hydrous manganese oxide (HMO); Design, provision, and installation of a completely functioning HVAC system including natural gas boiler/in-floor heating and natural gas overhead heaters; Provision and installation of a 600A 480V 3-phase electrical service and natural gas service; Provision and installation of a 200kW 480V 3-phase backup generator system including automatic transfer switch; Provision and installation of two (2) 75-hp pumps/motors and other well accessories for previously drilled wells; Provision and installation of approximately 325 feet of 6-inch PVC C900 DR18 water main, 145 feet of 6-inch HDPE DIPS DR11 water main (directional drilled), 85 feet of 10-inch PVC C900 water main, one (1) 10-inch gate valve, two (2) fire hydrants, one (1) water service line, and associated clearing and grubbing; Provision and installation of 65 feet of 8-inch PVC C900 sewer service line with one (1) 8-inch gate valve, one (1) sewer service line, 70 feet of 2-inch Sch 80 PVC backwash tank force main, and improvements to the existing sewer Lift Station #6; Complete demolition of the existing Site 1 pump house facility and decommission of the Norbert Hill pump house facility; Complete demolition of the existing booster station on the community water system. Site Directions: Site is located at the end of King Lane (dead end). King Lane is located southwest of the STH 54/Seminary Road round-a-bout by approximately 0.75 miles. King Lane is off of Seminary Road (to the east). No pre-bid meeting will be held. Contact Paul Truttmann with Oneida Nation for site visits. Question Deadline 07/03/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Kevin Staus, P.E.; Indian Health Service; 129 North Brown St; Rhinelander, WI 54501; kevin.staus@ihs.gov; 715-365-5116
Award
Water / Sewer
$4,514,586.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
August 11, 2025
King Ln, Oneida, WI
Related To This Project
Oneida, WI
Bid Date: Jun 26 2024
Oneida, WI
Bid Date: Aug 15 2024
Oneida, WI
Bid Date: Oct 24 2024
Oneida, WI
Bid Date: Feb 04 2025
Oneida, WI
Bid Date: Mar 04 2025
Oneida, WI
Bid Date: Mar 06 2025
Oneida, WI
Bid Date: Mar 13 2025
Oneida, WI
Bid Date: Apr 28 2025
Oneida, WI
Bid Date: Jun 03 2024
Oneida, WI
Bid Date: Jun 03 2024
Oneida, WI
Bid Date: Jun 05 2024
Oneida, WI
Bid Date: May 23 2024
Oneida, WI
Bid Date: Apr 24 2024
Oneida, WI
Bid Date: Feb 27 2024
Oneida, WI
Bid Date: Sep 30 2022
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.