Published July 12, 2024 at 8:00 PM

Updated July 13, 2024

Site work for a water / sewer project in Homer, Alaska. Completed plans call for site work for a water / sewer project.

The proposed work is located within the limits of the City of Homer and is illustrated on the plans entitled Paintbrush Booster Pump Station Upgrade. The project consists of furnishing all labor, materials, equipment, tools, supervision and other facilities necessary for the performance of the work described herein and shown on the project drawings. The work includes, but is not limited to: o Replace existing pumps with integral VFDs with new, vertical multistage centrifugal pumps and wall mounted VFDs. o Salvage and reinstall stainless-steel inlet and outlet headers, isolation valves, and check valves. o Replace pressure tank. o Furnish and install VFDs and enclosures. o Furnish and install RTU and enclosure. o Furnish and install combination meter base. o Furnish and install 1-phase, 3-wire panelboard with 200-amp rated main circuit breaker Performance and Payment bonds in the amount of 100 percent (100%) of the bid amount are required. Cashier checks in an amount equal to five percent (5%) of the bid are acceptable. Surety bonds are acceptable. Start Construction July 8, 2024 Contract Completion December 31, 2024 Notice to Proceed June 26, 2024 Award by City Council June 24, 2024 Please direct all questions in writing regarding this project to: Daniel Kort, Public Works Director City of Homer Public Works Dept. 3575 Heath Street Homer, Alaska 99603 Email: dkort@ci.homer.ak.us Phone: (907) 435-3141 The City of Homer reserves the right to accept or reject any or all bids, and to waive irregularities or informalities in the bids. The proposed work is located within the limits of the City of Homer and is illustrated on the plans entitled Paintbrush Booster Pump Station Upgrade. The project consists of furnishing all labor, materials, equipment, tools, supervision and other facilities necessary for the performance of the work described herein and shown on the project drawings. The work includes, but is not limited to: Replace existing pumps with integral VFDs with new, vertical multistage centrifugal pumps and wall mounted VFDs. Salvage and reinstall stainless-steel inlet and outlet headers, isolation valves, and check valves. Replace pressure tank. Furnish and install VFDs and enclosures. Furnish and install RTU and enclosure. Furnish and install combination meter base. Furnish and install 1-phase, 3-wire panelboard with 200-amp rated main circuit breaker.

Bid Results

Water / Sewer

$276,300.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
4
Bidding Soon
38
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.