Site work for a water / sewer project in Homer, Alaska. Completed plans call for site work for a water / sewer project.
The proposed work is located within the limits of the City of Homer and is illustrated on the plans entitled Paintbrush Booster Pump Station Upgrade. The project consists of furnishing all labor, materials, equipment, tools, supervision and other facilities necessary for the performance of the work described herein and shown on the project drawings. The work includes, but is not limited to: o Replace existing pumps with integral VFDs with new, vertical multistage centrifugal pumps and wall mounted VFDs. o Salvage and reinstall stainless-steel inlet and outlet headers, isolation valves, and check valves. o Replace pressure tank. o Furnish and install VFDs and enclosures. o Furnish and install RTU and enclosure. o Furnish and install combination meter base. o Furnish and install 1-phase, 3-wire panelboard with 200-amp rated main circuit breaker Performance and Payment bonds in the amount of 100 percent (100%) of the bid amount are required. Cashier checks in an amount equal to five percent (5%) of the bid are acceptable. Surety bonds are acceptable. Start Construction July 8, 2024 Contract Completion December 31, 2024 Notice to Proceed June 26, 2024 Award by City Council June 24, 2024 Please direct all questions in writing regarding this project to: Daniel Kort, Public Works Director City of Homer Public Works Dept. 3575 Heath Street Homer, Alaska 99603 Email: dkort@ci.homer.ak.us Phone: (907) 435-3141 The City of Homer reserves the right to accept or reject any or all bids, and to waive irregularities or informalities in the bids. The proposed work is located within the limits of the City of Homer and is illustrated on the plans entitled Paintbrush Booster Pump Station Upgrade. The project consists of furnishing all labor, materials, equipment, tools, supervision and other facilities necessary for the performance of the work described herein and shown on the project drawings. The work includes, but is not limited to: Replace existing pumps with integral VFDs with new, vertical multistage centrifugal pumps and wall mounted VFDs. Salvage and reinstall stainless-steel inlet and outlet headers, isolation valves, and check valves. Replace pressure tank. Furnish and install VFDs and enclosures. Furnish and install RTU and enclosure. Furnish and install combination meter base. Furnish and install 1-phase, 3-wire panelboard with 200-amp rated main circuit breaker.
Bid Results
Water / Sewer
$276,300.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2024
July 8, 2024
Multiple Locations, Homer, AK
Related To This Project
Homer, AK
Bid Date: Jun 18 2024
Homer, AK
Bid Date: Nov 07 2025
Homer, AK
Bid Date: Nov 18 2020
Homer, AK
Bid Date: Sep 25 2024
Homer, AK
Bid Date: Apr 30 2024
Homer, AK
Bid Date: May 23 2024
Homer, AK
Bid Date: May 09 2024
Homer, AK
Bid Date: Apr 30 2024
Homer, AK
Bid Date: Feb 28 2024
Homer, AK
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.